My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-302
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 1:58:16 PM
Creation date
10/1/2015 12:38:17 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
09/16/2008
Control Number
2008-302
Agenda Item Number
15.B.4
Entity Name
Geosyntec, Inc.
Subject
Amendment No. 1 to Work Order No. 9 Borrow Area Permitting at Landfill
Area
Indian River County Landfill Facility
Supplemental fields
SmeadsoftID
7594
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P. E . <br /> 9 August 2008 <br /> Page 2 <br /> approval of the ERP application to the FDEP. This change required additional engineering <br /> effort by Geosyntec to re-educate the FDEP-assigned review team on the details of the <br /> application in order to enable them to conduct an effective review of the submitted permit <br /> application . SWDD has since received comments from both FDEP and SJRWMD requesting <br /> additional information to review the respective permit applications . This proposal requests <br /> additional funding authorization necessary to respond to the RAIs from both agencies to all <br /> them to complete the review and approval of the ERP and CUP applications for the borrow <br /> pond by the FDEP and SJRWMD, respectively. Additionally, a tree location and identification <br /> survey is required to complete the IRC PDP application . <br /> The remainder of this proposal presents : (i) proposed scope of work; ( ii) budget estimate ; and <br /> (iii) schedule . <br /> PROPOSED SCOPE OF WORK <br /> For budgeting purposes, the additional scope of work will be performed under four of the five <br /> tasks (phases) in Work Order No . 9 . The additional scope of work for each phase is briefly <br /> described below. <br /> Phase 1 : General Consulting/Meeting Support/Project Management <br /> Geosyntec will meet with FDEP to discuss our preliminary responses to their comments on the <br /> ERP application . This meeting, with prior authorization from SWDD in an effort to accelerate <br /> the permitting process, was held on 1 August 2008 .) A similar meeting will also be held with <br /> SJRWMD to discuss responses to comments on the CUP modification application . <br /> Project management activities, including budget and schedule tracking, invoicing (including <br /> review and approval of subcontractor invoices), and preparation of monthly progress reports, <br /> will be provided as part of this phase . <br /> Phase 2 : ERP Application <br /> Geosyntec will prepare written responses to the FDEP RAI . Geosyntec will revise the borrow <br /> area construction drawings to avoid impacts to Wetland 16 in response to FDEP ' s request. <br /> Additional stormwater modeling and routing calculations will be performed to provide adequate <br /> responses to FDEP ' s request for additional information on the pre- and post-discharge analysis <br /> for the borrow pond . Also , as part of this phase, and with prior approval from SWDD , <br /> Geosyntec has subcontracted the archaeological/ cultural resource reconnaissance survey <br /> requested by FDEP to Environmental Services, Inc . (ESI) . A copy of ESI ' s proposal is included <br /> as Attachment 1 -A . ESI has completed its work and we are reviewing their draft report for <br /> inclusion into the RAI response to FDEP . <br /> FL 1320-0 1 /JL80212.doc <br /> c tt ;tttt 1 }c� scictitisls ltinove] tors <br />
The URL can be used to link to this page
Your browser does not support the video tag.