My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-248
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 10:21:38 AM
Creation date
10/1/2015 12:28:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/12/2008
Control Number
2008-248
Agenda Item Number
15.B.3
Entity Name
Geosyntec Inc.
Subject
Work Order No.15 fuel tank relocation
Area
DOT Facility to landfill
Supplemental fields
SmeadsoftID
7516
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 3 <br /> SCHEDULE <br /> Work Order 15 <br /> Vero Beach, FL <br /> Upon approval of the Work Order, it is anticipated that Geosyntec will prepare design drawings <br /> for the fueling area and perform the Phase I ESA and NEPA Evaluation in June 2008 . Upon <br /> completion of the design drawings and construction permitting, it is anticipated that the fueling <br /> area construction activities will be completed in July/August 2008 . Upon completion of the <br /> fueling area concrete pad, the AST will be re-located from the Gifford Road site in August 2008 <br /> and the steel AST located at the IRC landfill will be closed in August/September 2008 <br />. <br /> Geosyntec anticipates that the Tank Closure Assessment Report documenting the closure of the <br /> steel AST located at the IRC landfill will be submitted by October 2008 . <br /> XR08051 R/CCR08045R. DOC <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.