Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
GeoSyntec Consultants <br /> Detail Labor Cost Summary Spreadsheet <br /> Associate/ Senior Project Project Assistant Senior Staff Designer Word Admin Total Direct Loaded <br /> Principal Engineer Engineer Proj . Eng. Eng/Hydro Processor Clerical Hours Cost Cost <br /> Direct Labor Rate: $52.41 $44 .34 $30. 81 $23 .22 $22. 11 $22 . 60 $ 17 .47 $ 14. 83 <br /> Task 2 : Biennial Reporting-Closed Labor Hours 6 32 240 40 24 16 358 <br /> Landfill Sites Cost Subtotal $314.46 $ 1418 . 88 $5 ,306 .40 1 $904.00 $419 .28 $237 .28 1 $ 8 <br />,600 . 30 $27 ,434 . 96 <br /> Total Labor Hours 6 32 240 40 24 16 358 <br /> Raw Labor Cost $314.46 $ 1 ,418 . 88 $5 ,306.40 $904.00 $419.28 $237 .28 $ 83600 . 30 <br /> Overhead Cost (x2 . 19) $688 . 67 $3 , 107. 35 $ 119621 .02 $ 19979 . 76 $918 .22 $519.64 $ 18 ,834 <br />. 66 <br /> Total Labor Cost $19003. 13 $4,526.23 $169927.42 $29883 .76 $ 1 ,337.50 $756.92 $27,434.96 <br /> XR03035/R030082rev-task 2.xls Page 2 of 5 4/9/2003 <br />