My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-011B
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-011B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2016 1:39:54 PM
Creation date
9/30/2015 7:38:33 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/04/2005
Control Number
2005-011B
Agenda Item Number
11.I.4
Entity Name
Dunkelberger Engineering
Subject
Professional Services Agreement
Project Number
7018
Archived Roll/Disk#
4000
Supplemental fields
SmeadsoftID
3838
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DUNKELBERGER ENGINEERING & TESTING, INC . <br /> Indian River County <br /> Geotechnical Services Fee Schedule <br /> November 2004 through September 30, 2005 <br /> DE &T Project No. P04404602 <br /> K . Thin-Walled Tub Samples (Shelby and Fixed Piston) $ 97 . 00/each <br /> L . Groundwater Measurement and Sampling <br /> 1 . Shallow Piezometer (less than 12 feet) $ 18 . 00/lf <br /> 2 . Grouted Piezometer (2 inch diameter) <br /> 0 - 25 ft depths $26 . 00/lf <br /> 25 - 50 ft depths $29 . 00/lf <br /> 50 - 75 ft depths $ 36 . 00/lf <br /> 75 - 100 ft depths $ 39 . 00/lf <br /> 3 . Groundwater Monitoring Wells 2 " diameter <br /> 0 - 25 ft depths $ 31 . 00/lf <br /> 25 - 50 ft depths $ 34 . 00/lf <br /> 50 - 75 ft depths $41 . 00/lf <br /> 75 - 100 ft depths $ 51 . 00/lf <br /> 4 . Locking Protection Assembly (Riser) $ 196 . 00 <br /> 5 . Locking Protection Assembly (flush mounted) $ 166 . 00 <br /> 6 . Clear/Develop Wells for Sampling $ 137 . 00 <br /> 7 . Sampling of Wells/Deliver to Water Quality Laboratory $ 55 . 00 <br /> M . Double-Ring Infiltration Test $ 382 . 00/test <br /> N . Field Vane Shear Test $ 56 . 00/test, <br /> Plus drilling costs <br /> O . Drill Rig/Crew (2-man) Stand-by $ 137 . 00/hour <br /> Note: This work usually requires utility notification and <br /> engineering analysis . MOT may also be needed. This work <br /> will be quoted on a project-by-project basis . <br /> �E&T Page 5 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.