My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-335
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-335
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2016 9:13:55 AM
Creation date
9/30/2015 10:11:20 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/03/2006
Control Number
2006-335
Agenda Item Number
7.A.A.
Entity Name
A.M. Engineering and Testing, Inc.
Subject
Renewal of Geotechnical Services Agreement
Project Number
0534
Supplemental fields
SmeadsoftID
5874
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDAMAN & ASSOCIATES, INC. <br /> PORT ST. LUCIE OFFICE <br /> FEE SCHEDULE <br /> FOR INDIAN RIVER COUNTY <br /> ENGINEERING/PUBLIC WORKS DEPARTMENT <br /> (October 1 , 2006 through September 30, 2007) <br /> CONCRETE SAMPLING AND TESTING <br /> Cylinder samples (4 cylinders per set) : molding, <br /> transporting, curing and strength testing (ASTM C-31 <br /> and C-39) . Includes one slump (ASTM C- 143) and one <br /> temperature determination. Cylinders shall be left in a <br /> place provided by the Contractor, covered with plastic <br /> caps and attempts made to provide shade thereon . If <br /> temperature of the air is critical to first 24 hours <br /> (during field curing) , equipment to maintain such <br /> controls shall be provided by others (no additional charge for pickup) $70.00/set <br /> Additional cylinders $ 13.00/cylinder <br /> Grout Prisms $270 .00/set of <br /> three <br /> Technician time due to construction delays in excess <br /> of 1 .0 hour portal to portal on the date cylinders <br /> are made . $42.00/hour <br /> Technician time $42.00/hour <br /> Curing and strength testing samples delivered to our <br /> laboratory (ASTM C-39) $ 12.00/cylinder <br /> Continuous monitoring of concrete placement and/or <br /> extra slump and temperature tests, technician time $42.00/hour <br /> Slump tests (ASTM C- 143) $ 12.00/test <br /> Air Entrainment (ASTM C- 173) $22.00/test <br /> Unit Weight $28.00/test <br /> Yield tests $28.00/test <br /> SAMPLING AND TESTING OF IN - PLACE CONCRETE/SOIL CEMENT <br /> Corina and testing of cored samples: <br /> Technician time (two technicians may be required) $42.00/hour/technician <br /> Mobilization of coring equipment : <br /> With power supplied $ 125.00/trip <br /> Without power supplied $ 100.00/trip <br /> Trimming, capping and strength testing (ASTM C-42) $28.00/core <br /> Depth measurement $ 12.00/core <br /> Pachometer testing : <br /> Mobilization of equipment $50.00/trip <br /> Technician time <br /> $42.00/hour <br /> " These prices are in effect for work completed through September 30, 2007. <br />
The URL can be used to link to this page
Your browser does not support the video tag.