Laserfiche WebLink
ARDAMAN & ASSOCIATES, INC. <br /> PORT ST. LUCIE OFFICE <br /> FEE SCHEDULE <br /> FOR INDIAN RIVER COUNTY <br /> ENGINEERING/PUBLIC WORKS DEPARTMENT <br /> (October 1 , 2006 through September 30, 2007) <br /> ASPHALT: FIELD INSPECTION , SAMPLING AND LABORATORY TESTING <br /> Corinq : <br /> Mobilization of coring equipment: <br /> With power supplied $ 125.00/trip <br /> Without power supplied $ 100.00/trip <br /> Technician time (two technicians may be required) $42.00/hour/technician <br /> Certified engineering technician to inspect <br /> preparation of base course/surface installation or plant control $48.00/hour <br /> Marshall stability and flow test (includes pill densities) $90.00/test <br /> Extraction and gradation tests (sampled hot) $90 .00/test <br /> Extraction and gradation tests (sampled from pavement) $ 125 .00/test <br /> In-situ Density tests ( minimum of six tests/trip) $22 .00/test <br /> Depth measurements $7 .00/test <br /> STRUCTURAL STEEL <br /> Field inspection for visual examination of welds, bolt torque <br /> testing , etc . <br /> Senior Project Consultant ( P . E .) <br /> $ 120.00/hour <br /> Senior Project Engineer (P .E.) $98.00/hour <br /> Project Engineer $85 .00/hour <br /> Sr. Engineering technician $48.00/hour <br /> Equipment charge to be determined by project <br /> TRAVEL CHARGES <br /> Charge determined on a per-job basis. (Most jobs are billed portal to portal) . <br /> OVERTIME AND HOLIDAY <br /> Charges will be increased 50% for work performed during weekends, <br /> official holidays, and during weekdays for hours <br /> exceeding 8 hours per day or 40 hours per week. <br /> SUBCONTRACTING SERVICES <br /> Cost plus 12% <br /> ` These prices are in effect for work completed through September 30, 2007. <br />