My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-235
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2016 10:44:59 AM
Creation date
9/30/2015 6:46:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
09/09/2003
Control Number
2003-235
Agenda Item Number
11.J.1
Entity Name
Underground Utilities Inc.
Subject
Work Authorization Directive No. 2001-036
Sludge Line
Area
Gifford Central WWTP
Project Number
2196
Bid Number
3032
Archived Roll/Disk#
3162
Supplemental fields
SmeadsoftID
3390
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AUTHORIZATION DIRECTIVE <br /> No . 2001 -036 <br /> IRC — Gifford Central WWTP Sludge Line 0 1 , a <br /> DATE OF ISSUANCE : September 22 , 2003 EFFECTIVE DATE : September 16 , 2003 <br /> OWNER: Indian River County <br /> CONTRACTOR: Underground Utilities, Inc . (George E . French) <br /> CONTRACT : WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS <br /> AND MISCELLANEOUS LABOR CONTRACT UCP #909 BID NO . 3032 <br /> PROJECT : IRC — Gifford Central WWTP 6" & 12 " Sludge Lines <br /> COUNTY UTILITY PROJECT NO . : UCP #2196 CONTRACTOR ' S PROJECT NO . : N/A <br /> COUNTY WIP No . 472 - 169000-00517 <br /> You are directed to proceed promptly with the following work: <br /> Description: <br /> The wastewater plant operator has requested that a 12" PVC sludge force main be installed from the discharge side <br /> of the sludge pump station to the influent side of the equalization splitter box structure and a 6" force main from the <br /> 4" scum line to the sludge feed at the septage/sludge and grease transfer station. <br /> Purpose of Work Change Directive : <br /> To increase the efficiency of the treatment plant and reduce odors. <br /> Exhibit 1 Plan sheet showing location and details of work. <br /> Method of determining Contract Price : <br /> ❑x Unit Prices : Bid Items as established pursuant to Bid No . 3032, and awarded by the Board of <br /> County <br /> Commissioners on January 7, 2001 to George E . French, Renewed April, 2003 as Underground Utilities, Inc . <br /> ❑ Lump Sum <br /> ❑ Cost of the Work <br /> The Cost of Labor, Contingency and Contract Time is summarized below: <br /> Estimated Labor Cost = $ 12 , 884 .40 Estimated Contract Time : 30 days <br /> Contingency at 10% _ $ 19288 .44 <br /> Total Estimated Labor Costs = $ 147172 . 84 <br /> ACCEPTED : RECO . MEND APPRO D : <br /> t <br /> eor . French Gordon E . SpVr , .E . Assist irector o til e <br /> Utility Labor Contractor Enviroom-ne tal Engineer <br /> Date : 9 ted ` _ 03 Date : //' Date : <br /> APPW ED AS TO� FO <br /> AND L SUI <br /> BY <br /> / Attachment <br /> L <br /> N <br /> E . ELL APPROVED : <br /> ASSISTANT COUNTY ATTORNEY <br /> By : <br /> nneth R . Macht , C airman <br /> September 9 , 2003 <br /> F:\Utilities\UTILITY - ENGINEERING\Projects - Utility Construction Permits\IRC - Gifford Central WWTP Sludge Line UCP #2196\Work <br /> Authorization No. 2001 -036 - Attachment B .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.