My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-060
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2016 1:56:00 PM
Creation date
9/30/2015 10:35:52 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/13/2007
Control Number
2007-060
Agenda Item Number
9.B.2
Entity Name
Passage Island Homes
Subject
Gifford Park Security House
Area
Gifford Park
Project Number
0503
Bid Number
2007033
Supplemental fields
SmeadsoftID
6132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> SPECIAL PROVISIONS <br /> r 1 . SCOPE <br /> These Special Provisions shall supplement the General Conditions and shall govern purchases by the <br /> r County of Indian River under these Specifications, except that technical specifications, if any, will <br /> govern if any conflict arises between such technical specifications and these Special Provisions. <br /> 2, DESCRIPTION OF THE WORK/ALTERATIONS <br /> The work for this project shall consist of constructing : <br /> • Concrete block masonry, single family, residential unit with related finishes and <br /> furnishings. <br /> • Gravity sewer connections for the above. <br /> r • Water service main connections for the above. <br /> • All the above together with miscellaneous related incidentals. <br /> r <br /> Extra work: Without invalidating the contract, the OWNER may at any time, by written change <br /> order and without preliminary notice to the surety, order extra work within the general scope or alter <br /> the work by addition or reduction, and the contract price will be adjusted accordingly. <br /> Changes in work: The County shall have the right to suspend work wholly or in part for such period <br /> or periods as may be deemed necessary due to unsuitable weather or other conditions, which the <br /> County considers unfavorable for the work to proceed. No allowance of any kind will be made for <br /> such suspension of work except an equivalent time for completion of the contract. <br /> r <br /> Changed conditions: If during the progress of work, field conditions are found to differ materially <br /> from those covered by the Specifications or from those which could reasonably have been foreseen <br /> r by the CONTRACTOR after examination of the site, the CONTRACTOR shall call such conditions <br /> to the attention of the OWNER and necessary changes will be made to the Specifications. If these <br /> changes entail extra work or materials and the value of such work has not been determined by unit <br /> price under the contract, the values of such work or change shall be determined by negotiation. The <br /> OWNER and CONTRACTOR shall execute a change order to the contract at mutually satisfactory <br /> unit prices or lump sums for any extra work, addition or deletion made necessary by such changed <br /> r conditions and requested by the County. <br /> 3, COMMENCEMENT OF WORK <br /> The work shall commence immediately upon receipt of a Notice to Proceed. <br /> 4, TIME OF COMPLETION <br /> The work shall be completed within the time slated on the Bid Form, page 27 , as time required to <br /> Substantially Complete all work. Time is of the essence in the performance of the work under this <br /> contract. <br /> r <br /> Page 14 of 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.