My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-060
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2016 1:56:00 PM
Creation date
9/30/2015 10:35:52 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/13/2007
Control Number
2007-060
Agenda Item Number
9.B.2
Entity Name
Passage Island Homes
Subject
Gifford Park Security House
Area
Gifford Park
Project Number
0503
Bid Number
2007033
Supplemental fields
SmeadsoftID
6132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DELIVERY, STORAGE AND HANDLING <br /> + PART 1 : GENERAL <br /> 1 .01 SCOPE OF WORK <br /> A. This Section specifies the general requirements for the delivery handling, storage and <br /> protection for all items required in the construction of the work. Specific requirements, if <br /> any, are specified with the related item. <br /> 1 .02 TRANSPORTATION AND DELIVERY <br /> - <br /> A. Transport and handle items in accordance with manufacturer's instructions . <br /> B. Schedule delivery to reduce long-term on-site storage prior to installation and/or <br /> operation. Under no circumstances shall equipment be delivered to the site more than <br /> - <br /> one month prior to installation without written authorization from the Engineer. <br /> C. Coordinate delivery with installation to ensure minimum holding time for items that are <br /> — <br /> hazardous, flammable, easily damaged or sensitive to deterioration. <br /> D . Deliver products to the site in manufacturer's original sealed containers or other packing <br /> _ systems, complete with instructions for handling, storing, unpacking, protecting and <br /> installing. <br /> E. All items delivered to the site shall be unloaded and placed in a manner, which will not <br /> - <br /> hamper the Contractor's normal construction operation or those of subcontractors and <br /> other contractors and will not interfere with the flow of necessary traffic. <br /> - <br /> F. Provide necessary equipment and personnel to unload all items delivered to the site. <br /> G. Promptly inspect shipment to assure that products comply with requirements, quantities <br /> are correct, and items are undamaged. For items furnished by others (i. e. Owner, other <br /> Contractors), perform inspection in the presence of the Engineer. Notify Engineer <br /> verbally, and in writing, of any problems. <br /> 1 .03 STORAGE AND PROTECTION <br />+ <br /> A. Store and protect products in accordance with the manufacturer's instructions, with seals <br /> and labels intact and legible. Storage instruction shall be studied by the Contractor and <br />,. reviewed with the engineer by him/her. Instruction shall be carefully followed and a <br /> written record of this kept by the Contractor. Arrange storage to permit access for <br /> inspection. <br />- <br /> Store loose granular materials on solid flat surfaces in a well-drained area. Prevent <br /> mincing with foreign matter. <br />+ <br /> Cement and lime shall be stored under a roof and off the ground and shall be kept <br /> completely dry at all times. All structural, miscellaneous and reinforcing steel shall be <br /> stored off the ground or otherwise to prevent accumulations of dirt or grease, and in a <br /> position to prevent accumulations of standing water and to minimize rusting. Beams <br /> Page 22 of 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.