Laserfiche WebLink
DELIVERY, STORAGE AND HANDLING <br /> + PART 1 : GENERAL <br /> 1 .01 SCOPE OF WORK <br /> A. This Section specifies the general requirements for the delivery handling, storage and <br /> protection for all items required in the construction of the work. Specific requirements, if <br /> any, are specified with the related item. <br /> 1 .02 TRANSPORTATION AND DELIVERY <br /> - <br /> A. Transport and handle items in accordance with manufacturer's instructions . <br /> B. Schedule delivery to reduce long-term on-site storage prior to installation and/or <br /> operation. Under no circumstances shall equipment be delivered to the site more than <br /> - <br /> one month prior to installation without written authorization from the Engineer. <br /> C. Coordinate delivery with installation to ensure minimum holding time for items that are <br /> — <br /> hazardous, flammable, easily damaged or sensitive to deterioration. <br /> D . Deliver products to the site in manufacturer's original sealed containers or other packing <br /> _ systems, complete with instructions for handling, storing, unpacking, protecting and <br /> installing. <br /> E. All items delivered to the site shall be unloaded and placed in a manner, which will not <br /> - <br /> hamper the Contractor's normal construction operation or those of subcontractors and <br /> other contractors and will not interfere with the flow of necessary traffic. <br /> - <br /> F. Provide necessary equipment and personnel to unload all items delivered to the site. <br /> G. Promptly inspect shipment to assure that products comply with requirements, quantities <br /> are correct, and items are undamaged. For items furnished by others (i. e. Owner, other <br /> Contractors), perform inspection in the presence of the Engineer. Notify Engineer <br /> verbally, and in writing, of any problems. <br /> 1 .03 STORAGE AND PROTECTION <br />+ <br /> A. Store and protect products in accordance with the manufacturer's instructions, with seals <br /> and labels intact and legible. Storage instruction shall be studied by the Contractor and <br />,. reviewed with the engineer by him/her. Instruction shall be carefully followed and a <br /> written record of this kept by the Contractor. Arrange storage to permit access for <br /> inspection. <br />- <br /> Store loose granular materials on solid flat surfaces in a well-drained area. Prevent <br /> mincing with foreign matter. <br />+ <br /> Cement and lime shall be stored under a roof and off the ground and shall be kept <br /> completely dry at all times. All structural, miscellaneous and reinforcing steel shall be <br /> stored off the ground or otherwise to prevent accumulations of dirt or grease, and in a <br /> position to prevent accumulations of standing water and to minimize rusting. Beams <br /> Page 22 of 40 <br />