Laserfiche WebLink
i <br /> BID SCHEDULE <br /> ITEM NO. DESCRIPTION QTY UNIT* UNIT PRICE TOTAL <br /> i <br /> Concrete Block Building, complete, including <br /> sitework, clearing, grubbing, earthwork, grading, <br /> a 1 mobilization, as-builts, roofing, electrical, HVAC, I LS 105,726.00 1059726. 00 <br /> plumbing, plumbing connections, driveway, fencing, <br /> finishes and related incidentals <br /> 2.A. 1 . Allowances — Flooring, Carpet 1 LS 25400.00 2,400.00 <br /> 2.A.2. Allowances — Flooring, Ceramic Tile I LS 3,700.00 3 ,700.00 <br /> a <br /> 2.13. 1 . Allowances — Fixtures, Fans 1 LS 250.00 250.00 <br /> 2.13.2. Allowances — Fixtures, Lights 1 LS 250.00 250.00 <br /> a <br /> 2 .C. 1 . Allowances — Cabinets, Kitchen (including fixtures) 1 LS 45800.00 4,800.00 <br /> a 2.C.2 . Allowances — Cabinets, Bath (including fixtures) 1 LS 800.00 800.00 <br /> 2.D. 1 . Allowances — Appliances, Kitchen I LS 23400.00 25400.00 <br /> r <br /> 2 .D.2. Allowances — Appliances, Laundry 1 LS 800.00 800.00 <br /> r 2.E. 1 . Allowances — Openings, Windows 1 LS 11400.00 1 ,400.00 <br /> 2.E. 1 . Allowances — Openings,, Doors, Locksets & Hardware 1 LS 1 ,500.00 15500.00 <br /> a <br /> 3 . Furnish and Install Sod 1900 SY 1 .66 39154.00 <br /> Canopy Trees, including bracing, fertilization, <br /> 4 watering and maintenance 2 EA 250.00 500.00 <br /> (Grand Total, Items 1 -4 Show On Page 27) TOTAL 1279680.00 <br /> i <br /> * LS — Lump Sum <br /> SY — Square Yard <br /> LF — Lineal Foot <br /> a EA - Each <br /> r <br /> r <br /> a <br /> r' <br /> i <br />