My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-193C.
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-193C.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2017 2:16:07 PM
Creation date
10/1/2015 12:15:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Plan
Approved Date
06/06/2006
Control Number
2006-193C.
Agenda Item Number
10.A.
Entity Name
Geographic Technologies Group,
Subject
Three year implementation plan and assessments
Geographic Information Systems GIS
Supplemental fields
SmeadsoftID
7372
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mobile Inspector Laptop Version <br /> Building Inspectors can perform inspection data entry in the office via the internal network or <br /> in the field via a laptop PC . Navtrak ' s wireless GPS modem allows inspectors to send and <br /> receive inspection information through a wireless connection . Mobile Inspector, Laptop <br /> provides the following functionality ; <br /> • Daily Itinerary Information <br /> • Field Inspection capabilities (including transmission of results ) <br /> • Database queries for inspection and permit information <br /> Ad hoc inspection capabilities <br /> Mobile Contractor <br /> Contractors have the ability to submit inspection requests and inquire on inspection results <br /> while in the field via a wireless Internet cell phone or PC . With this product, the Building <br /> Division provides contractors with the ability to schedule inspections , cancel inspections , <br /> view inspection history and results , and view permit information . <br /> Current Inspections Process Workflow <br /> 1 . An itinerary for each inspector is generated daily based on inspection requests <br /> received from the previous day or carry over of unfinished work . <br /> 2 . MobileHWY determines the most efficient method for transmitting and receiving the <br /> itinerary from the core CD- Plus database . <br /> 3 . Data supplied from CD- Plus and loaded into a temporary database . <br /> 4 . ArcLogistics Route software determines the routing and orders the inspections per <br /> inspector based on parameters established by Navtrok and Indian River County . <br /> 5 . GPS coordinates and specific trade information plotted and mapped out for most <br /> efficient route per inspector. <br /> 6 . Itineraries for the day are automatically downloaded and uncompressed when a <br /> user logs on to the system . <br /> CD-Plus <br /> 3. Load into temporary <br /> database <br /> Temporary t <br /> 4 . Run Routing . . - ' Database 2. Pull itinerary from <br /> - - - ----' XML database <br /> ArcLogistics L _ <br /> Route <br /> 5 Receive routing - - <br /> instructions for inspections ' ' 1 . Initiate Itinerary Load <br /> y <br /> LaPmP <br /> a ' <br /> VAMN <br /> Workflow Diagram for MobileHWY Inspections Process <br /> 12 <br /> GIS Needs Assessment and Implementation Plan Chapter 1 - Departmental GIS Needs Assessment <br />
The URL can be used to link to this page
Your browser does not support the video tag.