Laserfiche WebLink
EXHIBIT "A " <br /> PRE LEMENARY COST ESTIMATE <br /> for uncompleted work within the limits of the plat for "Harbor Villages Phase V <br /> I <br /> Marina Village Site " B " at Grand Harbor, a Planned Residential Development" to <br /> supporta Contract for Completion of Improvements <br /> Description of Items <br /> 1 . Roadway asphalt (3/4 inches thick <br /> 6570 sy @ $ 3 . 75Isy $242637. 50 <br /> 21 Street Lights 5 each <br /> @ $ 1500 $ 7, 500 . 00 <br /> 3 , Landscaping/Sod 2 Islands .@ @ $ 3 ,000 ea. $ 6, 000 . 00 , <br /> 4 . Sidewalk 24255F elf : L'2. <br /> 5 . Curb @ $2 ' 25 $ 5 ,456 . 25 <br /> 160 LF @ $7. 00 $ 1120 . 00 <br /> 6 . Concrete Ramps ,: 1040SF <br /> @ $ 17 . 40 $ 18 , 096 . 00 <br /> T Dumpster Pad 2 each @ $ 3750 . 00 <br /> $ 7, 500 . 00 <br /> 8 . Striping (On 2nd Lift of Asphalt) IDS @ $ 1500 . 00 <br /> $ 1 , 500 . 00 <br /> Total : <br /> $ 71 , 809 . 75 <br /> Engineering and Surveying ( 10%) <br /> $.Z1 80 . 96 <br /> $ 78 , 990 . 71 <br /> Bond required ( 15 %) <br /> . $ 11 . 848 . 61 <br /> Performance Bond Total <br /> $ 90, 839 . 32 <br /> 2002 <br /> Stephen E. Moler, P .E. , FL #33193 <br /> MASTELLER & MOLER, INC . <br /> 1 <br />