Laserfiche WebLink
Task 4 - Construction. Construction of the Main Relief Canal Pollution Control Structure will take place once the <br />construction plans have been completed and the necessary permits obtained. Indian River County, as well as its consulting <br />engineers, will provide construction inspection in order to assure that the improvements are built in accordance with the plans <br />and specifications. Indian River County staff will bid and award the construction contract and administer it during <br />construction. <br />Deliverables: Construction progress summary (contained in Quarterly Reports) <br />Task 5 - Public Involvement. A stormwater education campaign will be initiated in concert with construction to heighten <br />awareness of the canal drainage system and the pollution it carries to the estuary. The St. Johns River Water Management <br />District's IRL License Plate program has authorized the funding of 100 metal 30" x 34" street signs to be erected at strategic <br />locations throughout the drainage basin. The sign will picture the license plate snook and read: "All Canals Drain To Lagoon <br />- No Trash!". Signs will be placed at intersections near major canals. Newspaper articles and brochures will link the new <br />road signs with the construction of the Main Relief Canal pollution control structure. <br />Deliverables: Summary of Public involvement (contained in Quarterly Reports) <br />Task 6 - Effectiveness Evaluation (Water Quality Monitoring). Project effectiveness monitoring will be provided in order to <br />demonstrate the environmental benefits of the Main Relief Canal Pollution Control Structure. A Preliminary Effectiveness <br />Monitoring Plan (Water Quality Monitioring Plan) has been included in this proposal as Attachment A.. <br />Deliverables: Summary of water quality monitoring results (contained in Preliminary Project Report and Final Project <br />Report) <br />Quarterly Reports. Each quarter, a project status report will be prepared. <br />Deliverables: Quarterly Reports <br />Task 7 - Preliminary Project Report. A preliminary project report will be prepared that will access the project's effectiveness. <br />It will be prepared about one-half way through the water quality monitoring program and will be updated by the Final Project <br />Report. <br />Deliverables: A Preliminary Project Report <br />Task 8 - Final Project Report. A final project report will be prepared at the conclusion of the water quality monitoring <br />program and it will summarize the project's effectiveness and make recommendations for similar future projects. <br />Deliverables: Final Project Report (five paper copies and one CD) <br />REMAINDER OF PAGE INTENTIONALLY LEFT BLANK <br />DEP Agreement No. G0182, Attachment A, Page 7 of 10 <br />