My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-121
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 10:50:49 AM
Creation date
9/30/2015 9:38:52 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/11/2006
Control Number
2006-121
Agenda Item Number
7.H.
Entity Name
Department of Evironmental Protection
Subject
Grant Award for Main Relief Canal Pollution Control Structure No. G0182
Project Number
C9-99451505-0
Supplemental fields
SmeadsoftID
5589
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 4 - Construction. Construction of the Main Relief Canal Pollution Control Structure will take place once the <br />construction plans have been completed and the necessary permits obtained. Indian River County, as well as its consulting <br />engineers, will provide construction inspection in order to assure that the improvements are built in accordance with the plans <br />and specifications. Indian River County staff will bid and award the construction contract and administer it during <br />construction. <br />Deliverables: Construction progress summary (contained in Quarterly Reports) <br />Task 5 - Public Involvement. A stormwater education campaign will be initiated in concert with construction to heighten <br />awareness of the canal drainage system and the pollution it carries to the estuary. The St. Johns River Water Management <br />District's IRL License Plate program has authorized the funding of 100 metal 30" x 34" street signs to be erected at strategic <br />locations throughout the drainage basin. The sign will picture the license plate snook and read: "All Canals Drain To Lagoon <br />- No Trash!". Signs will be placed at intersections near major canals. Newspaper articles and brochures will link the new <br />road signs with the construction of the Main Relief Canal pollution control structure. <br />Deliverables: Summary of Public involvement (contained in Quarterly Reports) <br />Task 6 - Effectiveness Evaluation (Water Quality Monitoring). Project effectiveness monitoring will be provided in order to <br />demonstrate the environmental benefits of the Main Relief Canal Pollution Control Structure. A Preliminary Effectiveness <br />Monitoring Plan (Water Quality Monitioring Plan) has been included in this proposal as Attachment A.. <br />Deliverables: Summary of water quality monitoring results (contained in Preliminary Project Report and Final Project <br />Report) <br />Quarterly Reports. Each quarter, a project status report will be prepared. <br />Deliverables: Quarterly Reports <br />Task 7 - Preliminary Project Report. A preliminary project report will be prepared that will access the project's effectiveness. <br />It will be prepared about one-half way through the water quality monitoring program and will be updated by the Final Project <br />Report. <br />Deliverables: A Preliminary Project Report <br />Task 8 - Final Project Report. A final project report will be prepared at the conclusion of the water quality monitoring <br />program and it will summarize the project's effectiveness and make recommendations for similar future projects. <br />Deliverables: Final Project Report (five paper copies and one CD) <br />REMAINDER OF PAGE INTENTIONALLY LEFT BLANK <br />DEP Agreement No. G0182, Attachment A, Page 7 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.