My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-037N.
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-037N.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2017 10:02:05 AM
Creation date
9/30/2015 6:18:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/11/2003
Control Number
2003-037N.
Agenda Item Number
11.C.2.
Entity Name
Graves and Sons, Inc. & W.C. Graves, IV
Subject
Precision Application Equipment operation and maintenance plan
Cost Share Grant Contract
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
2881
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approval to install the practices according to approved designs. The BMP installation must meet <br /> all design criteria before it can be certified as complete by IRSWCD/NRCS staff. Routine <br /> consultation with NRCS/IRSWCD staff throughout the installation process is advised. <br /> Once installation is complete the grower shall provide the IRSWCD all of the appropriate <br /> documentation. The IRSWCD will then submit all of the documentation to the Board for <br /> authorization of reimbursement to the grower. <br /> The IRSWCD will provide FDACS with quarterly reports. These reports will include: a <br /> summary of all work accomplished, the number of acres enrolled in each practice, the amount of <br /> program funds distributed to date, a summary of the amount of program funds used as non- <br /> federal match, the amount of federal matching funds applied to this program through USDA <br /> conservation programs, and all of the invoices supporting the distribution of program funds. <br /> PROGRAM FUNDING PRIORITIES: <br /> Project funds for each year will be distributed to applicants based upon the Environmental <br /> Benefits Index (EBI) ranking delineated below. <br /> Environmental Benefit Index <br /> BMP POINTS <br /> 1. On-site Water Detention/Retention 100 each <br /> 2. Conversion or Repair of Flashboard Riser Water Control Structure 25 each <br /> 3. Precision Application Equipment 20 each <br /> 4. Portable Agrichemical Mixing Station 20 each <br /> 5. Chemigation Infrastructure 20 each <br /> 6. Aquatic Weed Ban ier 10 each <br /> 7. Permanent Agrichemical Washdown Station 10 each <br /> 8. Water Table Observation Well 5 each <br /> 9. Grade Stabilization Structure 5 each <br /> 10. Conversion to Microirrigation = 1 point per acre <br /> DELIVERABLES: <br /> 1. Quarterly reports as described above will be provided to the FDACS Project Manager in <br /> hard copy and electronic format. <br /> 2. A detailed Final Annual Report will be provided to the FDACS Project Manager in hard <br /> copy and electronic format. This report will consist of a detailed summary of the <br /> information included in the quarterly reports and an assessment of the overall success of <br /> the program. <br /> 03/0 /02 ; <br />
The URL can be used to link to this page
Your browser does not support the video tag.