Laserfiche WebLink
H. `'WATER VOLUME: Yes do BMPs <br /> Irrigation Practices: <br /> 1). Are irrigation events scheduled based on: _ <br /> • evapotranspiration (ET) _ Al. D15 <br /> • rainfall events, = Al, D15 <br /> • and/or other scientific data? A1, D15 <br /> Infrastructure: _ <br /> 2). Are existing canals and ditches maintained periodically? A7, <br /> 3). Can on-site detention or stora`Te be provided using the present <br /> system of canals and ditches? <br /> 4). Is there an on-site reservoir? A9 <br /> Drainage Management: <br /> 5). Are pumps and/or discharge structures setup to achieve uniform _ A2-3- '-8 <br /> drainage throughout the grove? <br /> 6). Are drainage events managed according to a Drainage _ Al-3 6-7 <br /> Management Plan? <br /> Water Table Management: <br /> 7). Are groundwater levels monitored to meet tree water demands <br /> and prevent root pruning by: <br /> • soil moisture probes ❑ Al 5-6 <br /> • tensiometers 1:1Al- - <br /> • water table observation wells _i Al 5-6 <br /> 2 <br />