My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-039
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 12:20:53 PM
Creation date
10/1/2015 3:16:16 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/10/2009
Control Number
2009-039
Agenda Item Number
8.I.
Entity Name
H & D Construction Co.
Subject
SR 60 Utility Improvements
Area
82nd Ave. to I-95
Bid Number
2009027
Supplemental fields
SmeadsoftID
10453
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rD tic 1L <br /> SECTION 00530 - EJCDC <br /> STANDARD FORM OF AGREEMENT <br /> BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> THIS AGREEMENT ("Agreement" or " Contract" ) , dated the l day of Fl�lt 11�te' in the <br /> year 20L by and between Indian River County , a political subdivision of the State of Florida <br /> ( hereinafter called OWNER ) and H & D Construction , Co . ( hereinafter called CONTRACTOR ) . <br /> OWNER and CONTRACTOR , in consideration of the mutual covenants hereinafter set forth , <br /> agree as follows : <br /> ARTICLE 1 WORK <br /> CONTRACTOR as an independent contractor and not as an employee shall furnish and complete <br /> all of the necessary labor , material , and equipment to perform the work as specified or indicated in <br /> the Contract Documents . The work is generally described as follows : <br /> ARTICLE 2 ENGINEER <br /> The project has been designed by Schulke , Bittle & Stoddard , LLC , hereinafter called ENGINEER , <br /> and who is to act as OWNER' S representative , assume all duties and responsibilities and have <br /> the rights and authority assigned to ENGINEER in the Contract Documents in connection with <br /> completion of the work in accordance with the Contract Documents . <br /> ARTICLE 3 CONTRACT TIME <br /> 3 . 1 The CONTRACTOR shall be substantially completed with the following timeframe <br /> ( a ) Within 15 calendar days from effective date of Notice to Proceed , Contractor <br /> shall complete the following tasks : <br /> 1 . Obtain all necessary permits . <br /> 2 . Receive approved shop drawings for all materials and equipment to be <br /> utilized <br /> in the job . <br /> 3 . Perform all photographic recording and documentation of conditions prior <br /> to construction . <br /> 4 . Locate all existing utilities in the area of work . <br /> 5 . Submit and secure approval of shop drawings . <br /> 6 . Mobilize all labor , equipment , and materials . <br /> 7 . Deliver and store all equipment and materials to the job site . <br /> 8 . Notify all utilities and other affected parties prior to initiating construction . <br /> ( b ) From 16 calendar days to 75 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks : <br /> 1 . Install all pipe and appurtenant items . <br /> 2 . Perform all testing . <br /> 3 . Restore all disturbed areas to theie pre- construction condition . <br /> 4 . Correct all deficiencies noted by Engineer . <br /> 00530 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.