My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (1)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:08:04 AM
Creation date
9/30/2015 11:52:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (1)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6828
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H . correlate the information known to Bidder, information and observations obtained from <br /> r visits to the Site, reports and drawings identified in the Bidding Documents, and all additional <br /> examinations, investigations , explorations, tests, studies, and data with the Bidding Documents; <br /> ,. I . promptly give ENGINEER written notice of all conflicts, errors, ambiguities, or <br /> discrepancies that Bidder discovers in the Bidding Documents and confirm that the written <br /> resolution thereof by ENGINEER is acceptable to Bidder; and <br /> J . determine that the Bidding Documents are generally sufficient to indicate and convey <br /> understanding of all terms and conditions for the performance of the Work. <br /> r 4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that <br /> Bidder has complied with every requirement of this Article 4 , that without exception the Bid is <br /> premised upon performing and furnishing the Work required by the Bidding Documents and <br /> applying any specific means, methods, techniques, sequences, and procedures of construction <br /> that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has <br /> given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder <br /> has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are <br /> acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and <br /> convey understanding of all terms and conditions for performing and furnishing the Work. <br /> • <br /> ARTICLE 5 - PRE-BID CONFERENCE <br /> w <br /> 5. 01 The date , time , and location for a Pre-Bid conference, if any, are specified in the <br /> Advertisement for Bids. Representatives of OWNER and ENGINEER will be present to discuss <br /> the Project. Bidders are encouraged to attend and participate in the conference. ENGINEER will <br /> transmit to all prospective Bidders of record such Addenda as ENGINEER considers necessary in <br /> response to questions arising at the conference. Oral statements may not be relied upon and will <br /> not be binding or legally effective. <br /> rr ARTICLE 6 - SITE AND OTHER AREAS <br /> , ,. 6.01 The Site is identified in the Bidding Documents. All additional lands and access <br /> thereto required for temporary construction facilities, construction equipment, or storage of <br /> materials and equipment to be incorporated in the Work are to be obtained and paid for by <br /> CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities <br /> are to be obtained and paid for by OWNER unless otherwise provided in the Bidding Documents. <br /> ARTICLE 7 - INTERPRETATIONS AND ADDENDA <br /> 7. 01 All questions about the meaning or intent of the Bidding Documents are to be <br /> submitted to ENGINEER in writing . Interpretations or clarifications considered necessary by <br /> ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all <br /> ++ parties through the Issuing Office as having received the Bidding Documents. Questions received <br /> less than ten days prior to the date for opening of Bids may not be answered . Only questions <br /> answered by Addenda will be binding. Oral and other interpretations or clarifications will be <br /> r without legal effect. <br /> 00200 - Instructions to Bidders REV 04-07 .doc <br /> 00200 - 4 <br /> F1EMineehnoCepBs1 Projecls19611-CR 512 Widening\9611 CR 512 PHASE I=ontrac[ Documerd5100200 . Inst chum 10 Bidden: REV 06-07.doc Rev. 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.