Laserfiche WebLink
H . correlate the information known to Bidder, information and observations obtained from <br /> r visits to the Site, reports and drawings identified in the Bidding Documents, and all additional <br /> examinations, investigations , explorations, tests, studies, and data with the Bidding Documents; <br /> ,. I . promptly give ENGINEER written notice of all conflicts, errors, ambiguities, or <br /> discrepancies that Bidder discovers in the Bidding Documents and confirm that the written <br /> resolution thereof by ENGINEER is acceptable to Bidder; and <br /> J . determine that the Bidding Documents are generally sufficient to indicate and convey <br /> understanding of all terms and conditions for the performance of the Work. <br /> r 4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that <br /> Bidder has complied with every requirement of this Article 4 , that without exception the Bid is <br /> premised upon performing and furnishing the Work required by the Bidding Documents and <br /> applying any specific means, methods, techniques, sequences, and procedures of construction <br /> that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has <br /> given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder <br /> has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are <br /> acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and <br /> convey understanding of all terms and conditions for performing and furnishing the Work. <br /> • <br /> ARTICLE 5 - PRE-BID CONFERENCE <br /> w <br /> 5. 01 The date , time , and location for a Pre-Bid conference, if any, are specified in the <br /> Advertisement for Bids. Representatives of OWNER and ENGINEER will be present to discuss <br /> the Project. Bidders are encouraged to attend and participate in the conference. ENGINEER will <br /> transmit to all prospective Bidders of record such Addenda as ENGINEER considers necessary in <br /> response to questions arising at the conference. Oral statements may not be relied upon and will <br /> not be binding or legally effective. <br /> rr ARTICLE 6 - SITE AND OTHER AREAS <br /> , ,. 6.01 The Site is identified in the Bidding Documents. All additional lands and access <br /> thereto required for temporary construction facilities, construction equipment, or storage of <br /> materials and equipment to be incorporated in the Work are to be obtained and paid for by <br /> CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities <br /> are to be obtained and paid for by OWNER unless otherwise provided in the Bidding Documents. <br /> ARTICLE 7 - INTERPRETATIONS AND ADDENDA <br /> 7. 01 All questions about the meaning or intent of the Bidding Documents are to be <br /> submitted to ENGINEER in writing . Interpretations or clarifications considered necessary by <br /> ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all <br /> ++ parties through the Issuing Office as having received the Bidding Documents. Questions received <br /> less than ten days prior to the date for opening of Bids may not be answered . Only questions <br /> answered by Addenda will be binding. Oral and other interpretations or clarifications will be <br /> r without legal effect. <br /> 00200 - Instructions to Bidders REV 04-07 .doc <br /> 00200 - 4 <br /> F1EMineehnoCepBs1 Projecls19611-CR 512 Widening\9611 CR 512 PHASE I=ontrac[ Documerd5100200 . Inst chum 10 Bidden: REV 06-07.doc Rev. 05/01 <br />