Laserfiche WebLink
r 15. SECTION 00310— Bid Form, page 00310-8, ITEMIZED BID SCHEDULE - <br />Item Description Quantity unit unit price Amount <br />630-1-22 Conduit (famish) (Underground) (2"PVC) 2580 LF <br />r <br />Shall be amended to read: <br />` Item Description Quantity unit unit price Amount <br />630-1-14 Conduit (furnish) (Underground Bore) (2"PVC) 2580 LF <br />16. Sheet T-2 of the Signalization Plans, Section H, notes 2 & 3 shall be omitted. <br />17. Sheet T-2 of the Signalization Plans, (Traffic Signal Mast Arms) FDOT approved paint process of <br />Hunter Green; (wet paint) will be accepted. <br />r 18. Sheet T-2 of the Signalization Plans, Section D, note 4 shall be amended to read: <br />FIBER OPTIC CABLE SHALL BE 96 -FIBER SINGLE MODE. A#14 AWG (OR IRC - <br />APPROVED ALTENRATIVE) TRACE WIRE MUST BE INSTALLED WITH THE FIBER <br />.� RUN. <br />r 19. SECTION 00310 — Bid Form, page 00310-9, ITEMIZED BID SCHEDULE Shall include an <br />additional Item under — Signalization <br />Item Description Quantity unit unit price Amount <br />630-1-12 Conduit (furnish) (underground) (2"PVC) 545 LF <br />685-128A Interface Panel (FO termination Cabinet 3 EA <br />.. 12 F Wall) (F&I) <br />685-128B Interface Panel (FO Splice Closure 12F 2 EA <br />UG) (F&I) <br />r 685-128B Interface Panel (FO Splice Closure 96F 1 EA <br />UG) (F&I) <br />680-201 Sys Aux — Terminal Server, Ethernet- 3 EA <br />r RS232, 2 Port (F&I) <br />687-011 Sys Aux — FO Ethernet Switch (F&I) 3 EA <br />686-101B Sys Aux — Camera Assembly, OSP (F&I) 3 EA <br />686-102B Sys Aux — Video Encoder MPEG IV 1 EA <br />(4 Channel) (F&I) <br />686-102B Sys Aux — Video Encoder MPEG W 2 EA <br />(8 Channel) (F&I) <br />700-48-18 Sign Panel 36"X30" (R10-16) 2 EA <br />` 20. SECTION 00310 — Bid Form, page 00310-6, ITEMIZED BID SCHEDULE items 570-1 through <br />590-70-2 shall include all landscaping, irrigation and littoral plantings for POND A, POND B and <br />r <br />101` Avenue. ( see revised ITEMIZED BID SCHEDULE) <br />21. All irrigation pumps shall include all labor and material necessary for power hook up. <br />` 22. Section 01720 Record Documents shall be included in Division 1 General Requirements of the <br />Contract Documents. (See attached Section 01720 Record Documents) <br />F.IEngineeringlCapita! Projects19611-CR 511 Wideningl9611 fR 51 Z PHASE 1 N9611 Addendum No. 2 for CR512 Ph 1V.doc <br />W <br />