My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (2)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:32:24 AM
Creation date
9/30/2015 11:52:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (2)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6829
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r CONTRACTOR shall carefully study and compare the <br />Contract Documents and check and verify pertinent <br />figures therein and all applicable field measurements. <br />CONTRACTOR shall promptly report in writing to <br />ENGINEER any conflict, error, ambiguity, or <br />discrepancy which CONTRACTOR may discover and <br />shall obtain a written interpretation or clarification from <br />! ENGINEER before proceeding with any Work <br />affected thereby; however, CONTRACTOR shall not <br />be liable to OWNER or ENGINEER for failure to <br />report any conflict, error, ambiguity, or discrepancy in <br />the Contract Documents unless CONTRACTOR <br />knew or reasonably should have known thereof. <br />W B. Preliminary Schedules: Within ten days after <br />the Effective Date of the Agreement (unless otherwise <br />specified in the General Requirements), CONTRAC- <br />TOR shall submit to ENGINEER for its timely review: <br />■r <br />1. a preliminary progress schedule <br />indicating the times (numbers of days or dates) <br />for starting and completing the various stages <br />of the Work, including any Milestones specified <br />in the Contract Documents; <br />2. a preliminary schedule of Shop <br />Drawing and Sample submittals which will list <br />each required submittal and the times for sub - <br />r miffing, reviewing, and processing such <br />submittal; and <br />3. a preliminary schedule of values for <br />• all of the Work which includes quantities and <br />prices of items which when added together <br />equal the Contract Price and subdivides the <br />to Work into component parts in sufficient detail to <br />serve as the basis for progress payments <br />during performance of the Work. Such prices <br />will include an appropriate amount of overhead <br />• and profit applicable to each item of Work. <br />the Site is <br />started, <br />CONTRACTOR and OWNS all <br />r. <br />each deliver <br />to <br />the other, with copi to each <br />additional <br />insured <br />identified in t upplementary <br />Conditions, certificates <br />of surance (and other <br />evidence <br />of insuranc ich either of them or any <br />additional <br />insur <br />may reasonably request) which <br />CONTRA,r.T6R <br />and OWNER respectively are <br />wor nderstanding among the parties as to the <br />Work and to s the schedules referred to in <br />paragraph 2.05.6, pro for handling Shop <br />Drawings and other submittals, p7oeessl0g Applica- <br />a <br />2.07 Initial Acceptance of Schedules <br />A. Unless otherwise provided in the Contract <br />Documents, at least ten days before submission of <br />the first Application for Payment a conference <br />attended by CONTRACTOR, ENGINEER, and others <br />as appropriate will be held to review for acceptability <br />to ENGINEER as provided below the schedules <br />submitted in accordance with paragraph 2.05.B. <br />CONTRACTOR shall have an additional ten days to <br />make corrections and adjustments and to complete <br />and resubmit the schedules. No progress payment <br />shall be made to CONTRACTOR until acceptable <br />schedules are submitted to ENGINEER. <br />1. The progress schedule will be <br />acceptable to ENGINEER if it provides an <br />orderly progression of the Work to completion <br />within any specified Milestones and the <br />Contract Times. Such acceptance will not <br />impose on ENGINEER responsibility for the <br />progress schedule, for sequencing, scheduling, <br />or progress of the Work nor interfere with or <br />relieve CONTRACTOR from CONTRACTOR's <br />full responsibility therefor. <br />2. CONTRACTOR's schedule of Shop <br />Drawing and Sample submittals will be <br />acceptable to ENGINEER if it provides a <br />workable arrangement for reviewing and <br />processing the required submittals. <br />3. CONTRACTOR's schedule of values <br />will be acceptable to ENGINEER as to form <br />and substance if it provides a reasonable <br />allocation of the Contract Price to component <br />parts of the Work. <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, <br />AMENDING, REUSE <br />3.01 Intent <br />r... .......... ---- <br />A. The Contract Documents are comple- <br />mentary; what is called for by one is as binding as if <br />2.06 Preconstruction Conference called for by all. <br />B. It is the intent of the Contract Documents to <br />to run, but before any Work at the Site i rted, a describe a functionally complete Project (or part there- <br />,,, conference attended by CONTRAC ENGINEER, of) to be constructed in accordance with the Contract <br />00700 -General Conditions REV 04-07 <br />00700-9 <br />F:1EngineeringwWnliams eiContradWaster Contract Documents\00700- General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.