Laserfiche WebLink
r CONTRACTOR shall carefully study and compare the <br /> Contract Documents and check and verify pertinent wor nderstanding among the parties as to the <br /> figures therein and all applicable field measurements. Work and to s the schedules referred to in <br /> CONTRACTOR shall promptly report in writing to paragraph 2 .05.6 , pro for handling Shop <br /> ENGINEER any conflict, error, ambiguity, or Drawings and other submittals , p Applica- <br /> discrepancy which CONTRACTOR may discover and <br /> shall obtain a written interpretation or clarification from <br /> ! ENGINEER before proceeding with any Work 2 .07 Initial Acceptance of Schedules <br /> affected thereby; however, CONTRACTOR shall not <br /> be liable to OWNER or ENGINEER for failure to A. Unless otherwise provided in the Contract <br /> report any conflict, error, ambiguity, or discrepancy in Documents, at least ten days before submission of <br /> the Contract Documents unless CONTRACTOR the first Application for Payment a conference <br /> knew or reasonably should have known thereof. attended by CONTRACTOR , ENGINEER, and others <br /> as appropriate will be held to review for acceptability <br /> B. Preliminary Schedules: Within ten days after to ENGINEER as provided below the schedules <br /> the Effective Date of the Agreement (unless otherwise submitted in accordance with paragraph 2 .05 . B . <br /> specified in the General Requirements), CONTRAC- CONTRACTOR shall have an additional ten days to <br /> TOR shall submit to ENGINEER for its timely review: make corrections and adjustments and to complete <br /> ur and resubmit the schedules. No progress payment <br /> 1 . a preliminary progress schedule shall be made to CONTRACTOR until acceptable <br /> indicating the times (numbers of days or dates) schedules are submitted to ENGINEER. <br /> for starting and completing the various stages <br /> of the Work, including any Milestones specified 1 . The progress schedule will be <br /> in the Contract Documents; acceptable to ENGINEER if it provides an <br /> orderly progression of the Work to completion <br /> 2. a preliminary schedule of Shop within any specified Milestones and the <br /> Drawing and Sample submittals which will list Contract Times . Such acceptance will not <br /> each required submittal and the times for sub- impose on ENGINEER responsibility for the <br /> mitting, reviewing , and processing such progress schedule, for sequencing , scheduling , <br /> submittal; and or progress of the Work nor interfere with or <br /> relieve CONTRACTOR from CONTRACTOR's <br /> 3. a preliminary schedule of values for full responsibility therefor. <br /> • all of the Work which includes quantities and <br /> prices of items which when added together 2. CONTRACTOR's schedule of Shop <br /> equal the Contract Price and subdivides the Drawing and Sample submittals will be <br /> Work into component parts in sufficient detail to acceptable to ENGINEER if it provides a <br /> serve as the basis for progress payments workable arrangement for reviewing and <br /> during performance of the Work. Such prices processing the required submittals . <br /> will include an appropriate amount of overhead <br /> • and profit applicable to each item of Work. 3 . CONTRACTOR'S schedule of values <br /> will be acceptable to ENGINEER as to form <br /> r c 4 f r • ❑ efGFe ZIP and substance if it provides a reasonable <br /> r. the Site is started , CONTRACTOR and OWNE all allocation of the Contract Price to component <br /> each deliver to the other, with cop", <br /> opi to each parts of the Work. <br /> additional insured identified in t upplementary ARTICLE 3 - CONTRACT DOCUMENTS : INTENT, <br /> Conditions, certificates of surance (and other AMENDING , REUSE <br /> evidence of insuranc ich either of them or any <br /> additional insur may reasonably request) which <br /> CONTRA R and OWNER respectively are 3 .01 Intent <br /> A. The Contract Documents are comple- <br /> mentary; what is called for by one is as binding as if <br /> 2. 06 Preconstruction Conference called for by all. <br /> B. It is the intent of the Contract Documents to <br /> to run , but before any Work at the Site i rted , a describe a functionally complete Project (or part there- <br /> ,,, conference attended by CONTRAC ENGINEER, of) to be constructed in accordance with the Contract <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 9 <br /> F:1EngineeringWWMiams eiContradWaster Contract Documents\00700 - General Conditions REV 04-07.doc <br />