My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (2)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:10:41 AM
Creation date
9/30/2015 11:52:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (2)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6829
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 3 . differs materially from that shown or or becoming bound under a negotiated <br /> indicated in the Contract Documents; or contract; or <br /> 4. is of an unusual nature, and differs b . the existence of such condition could <br /> r materially from conditions ordinarily reasonably have been discovered or <br /> encountered and generally recognized as revealed as a result of any examination, <br /> inherent in work of the character provided for in investigation , exploration, test, or study of <br /> r the Contract Documents ; the Site and contiguous areas required by <br /> the Bidding Requirements or Contract <br /> then CONTRACTOR shall , promptly after becoming Documents to be conducted by or for CON- <br /> aware thereof and before further disturbing the TRACTOR prior to CONTRACTOR's <br /> subsurface or physical conditions or performing any making such final commitment; or <br /> Work in connection therewith (except in an <br /> emergency as required by paragraph 6 . 16 .A) , notify c. CONTRACTOR failed to give the <br /> r OWNER and ENGINEER in writing about such written notice within the time and as re- <br /> condition . CONTRACTOR shall not further disturb quired by paragraph 4 .03.A. <br /> such condition or perform any Work in connection <br /> therewith (except as aforesaid) until receipt of written 3 . If OWNER and CONTRACTOR are <br /> order to do so . unable to agree on entitlement to or on the <br /> amount or extent, if any, of any adjustment in <br /> B . ENGINEER 's Review: After receipt of written the Contract Price or Contract Times , or both , a <br /> notice as required by paragraph 4.03.A, ENGINEER Claim may be made therefor as provided in <br /> will promptly review the pertinent condition, determine paragraph 10 .05. However, OWNER, <br /> the necessity of OWNER's obtaining additional ENGINEER, and ENGINEER's Consultants <br /> exploration or tests with respect thereto, and advise shall not be liable to CONTRACTOR for any <br /> an OWNER in writing (with a copy to CONTRACTOR) of claims, costs, losses, or damages (including <br /> ENGINEER's findings and conclusions . but not limited to all fees and charges of <br /> engineers, architects, attorneys, and other <br /> C. Possible Price and Times Adjustments professionals and all court or arbitration or <br /> other dispute resolution costs) sustained by <br /> 1 . The Contract Price or the Contract CONTRACTOR on or in connection with any <br /> Times, or both , will be equitably adjusted to the other project or anticipated project. <br /> extent that the existence of such differing <br /> subsurface or physical condition causes an in- 4.04 Underground Facilities <br /> crease or decrease in CONTRACTOR's cost <br /> r of, or time required for, performance of the A. Shown or Indicated. The information and data <br /> Work; subject, however, to the following: shown or indicated in the Contract Documents with <br /> respect to existing Underground Facilities at or <br /> a . such condition must meet any one or contiguous to the Site is based on information and <br /> more of the categories described in para- data furnished to OWNER or ENGINEER by the <br /> graph 4.03.A; and owners of such Underground Facilities, including <br /> OWNER, or by others. Unless it is otherwise <br /> r b . with respect to Work that is paid for expressly provided in the Supplementary Conditions: <br /> on a Unit Price Basis, any adjustment in <br /> Contract Price will be subject to the 1 . OWNER and ENGINEER shall not <br /> provisions of paragraphs 9.08 and 11 .03. be responsible for the accuracy or com- <br /> pleteness of any such information or data ; and <br /> 2 . CONTRACTOR shall not be entitled <br /> to any adjustment in the Contract Price or 2. the cost of all of the following will be <br /> Contract Times if: included in the Contract Price, and CONTRAC- <br /> TOR shall have full responsibility for: <br /> a . CONTRACTOR knew of the <br /> existence of such conditions at the time a . reviewing and checking all such <br /> CONTRACTOR made a final commitment information and data , <br /> to OWNER in respect of Contract Price and <br /> Contract Times by the submission of a Bid <br /> r <br /> 00700 - General Conditions REV 0407 <br /> 00700 - 12 <br /> F?EngineedngVWilViam \MasterContac Masl r Contract Dowments\00700 - General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.