Laserfiche WebLink
i <br /> r equipment and machinery, tools , appliances , fuel, <br /> 6 . 01 Supervision and Superintendence power, light, heat, telephone, water, sanitary facilities , <br /> temporary facilities, and all other facilities and <br /> A. CONTRACTOR shall supervise , inspect, and incidentals necessary for the performance, testing , <br /> i direct the Work competently and efficiently, devoting start-up, and completion of the Work. <br /> such attention thereto and applying such skills and <br /> expertise as may be necessary to perform the Work in B . All materials and equipment incorporated into <br /> W accordance with the Contract Documents . CON- the Work shall be as specified or, if not specified , shall <br /> TRACTOR shall be solely responsible for the means , be of goad quality and new, except as otherwise <br /> methods, techniques , sequences , and procedures of provided in the Contract Documents. All warranties <br /> construction , but CONTRACTOR shall not be and guarantees specifically called for by the <br /> i responsible for the negligence of OWNER or Specifications shall expressly run to the benefit of <br /> ENGINEER in the design or specification of a specific OWNER. If required by ENGINEER, CONTRACTOR <br /> means, method , technique, sequence, or procedure shall furnish satisfactory evidence (including reports of <br /> i of construction which is shown or indicated in and required tests) as to the source , kind , and quality of <br /> expressly required by the Contract Documents . CON- materials and equipment. All materials and <br /> TRACTOR shall be responsible to see that the equipment shall be stored , applied , installed , <br /> completed Work complies accurately with the connected , erected , protected , used , cleaned , and <br /> i Contract Documents. conditioned in accordance with instructions of the <br /> applicable Supplier, except as otherwise may be <br /> B . At all times during the progress of the Work, provided in the Contract Documents. <br /> • CONTRACTOR shall assign a competent resident <br /> superintendent thereto who shall not be replaced 6 .04 Progress Schedule <br /> without written notice to OWNER and ENGINEER <br /> except under extraordinary circumstances . The A. CONTRACTOR shall adhere to the progress <br /> i superintendent will be CONTRACTOR's schedule established in accordance with paragraph <br /> representative at the Site and shall have authority to 2 . 07 as it may be adjusted from time to time as <br /> act on behalf of CONTRACTOR. All communications provided below. <br /> i given to or received from the superintendent shall be <br /> binding on CONTRACTOR. 1 . CONTRACTOR shall submit to <br /> ENGINEER for acceptance (to the extent indi- <br /> 6.02 Labor, Working Hours cated in paragraph 2 .07) proposed <br /> Ir adjustments in the progress schedule that will <br /> A. CONTRACTOR shall provide competent, not result in changing the Contract Times (or <br /> suitably qualified personnel to survey, lay out, and Milestones). Such adjustments will conform <br /> r construct the Work as required by the Contract Docu- generally to the progress schedule then in <br /> ments. CONTRACTOR shall at all times maintain effect and additionally will comply with any <br /> good discipline and order at the Site. provisions of the General Requirements <br /> applicable thereto . <br /> B. Except as otherwise required for the safety or <br /> protection of persons or the Work or property at the 2. Proposed adjustments in the <br /> Site or adjacent thereto, and except as otherwise progress schedule that will change the <br /> i stated in the Contract Documents, all Work at the Site Contract Times (or Milestones) shall be <br /> shall be performed during regular working hours, and submitted in accordance with the requirements <br /> CONTRACTOR will not permit overtime work or the of Article 12. Such adjustments may only be <br /> performance of Work on Saturday, Sunday, or any made by a Change Order or Written Amend- <br /> legal holiday without OWNER's written consent ment in accordance with Article 12 . <br /> (which will not be unreasonably withheld) given after <br /> prior written notice to ENGINEER. 6 .05 Substitutes and "Or-Equals" <br /> i <br /> A. Whenever an item of material or equipment is <br /> 6 .03 Services, Materials, and Equipment specified or described in the Contract Documents by <br /> using the name of a proprietary item or the name of a <br /> 110 A. Unless otherwise specified in the General particular Supplier, the specification or description is <br /> Requirements, CONTRACTOR shall provide and intended to establish the type, function, appearance, <br /> assume full responsibility for all services, materials, and quality required . Unless the specification or <br /> i equipment, labor, transportation, construction description contains or is followed by words reading <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 19 <br /> F:\EngineeringUWiNtams\MasterContMdWaster Contract Domments100700 - General Conditions REV 04 7.doc <br /> i <br />