My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (2)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:32:24 AM
Creation date
9/30/2015 11:52:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (2)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6829
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />MP <br />0 <br />in <br />M <br />M <br />MI <br />r <br />r <br />No <br />M <br />M <br />W <br />r <br />• <br />177 <br />determine that the substitute proposed is equivalent to <br />that expressly called for by the Contract Documents. <br />The procedure for review by ENGINEER will be <br />similar to that provided in subparagraph 6.05.A.2. <br />C. Engineer's Evaluation: ENGINEER will be <br />allowed a reasonable time within which to evaluate <br />each proposal or submittal made pursuant to para- <br />graphs 6.05.A and 6.05.13. ENGINEER will be the <br />sole judge of acceptability. No "or -equal" or substitute <br />will be ordered, installed or utilized until ENGINEER's <br />review is complete, which will be evidenced by either <br />a Change Order for a substitute or an approved Shop <br />Drawing for an "or equal." ENGINEER will advise <br />CONTRACTOR in writing of any negative <br />determination. <br />D. Special Guarantee: OWNER may require <br />CONTRACTOR to furnish at CONTRACTOR's ex- <br />pense a special performance guarantee or other <br />surety with respect to any substitute. <br />E. ENGINEER's Cost Reimbursement: <br />ENGINEER will record time required by ENGINEER <br />and ENGINEER's Consultants in evaluating substitute <br />proposed or submitted by CONTRACTOR pursuant to <br />paragraphs 6.05.A.2 and 6.05.6 and in making <br />changes in the Contract Documents (or in the <br />provisions of any other direct contract with OWNER <br />for work on the Project) occasioned thereby. Whether <br />or not ENGINEER approves a substitute item so pro- <br />posed or submitted by CONTRACTOR, CON- <br />TRACTOR shall reimburse OWNER for the charges <br />of ENGINEER and ENGINEER's Consultants for <br />evaluating each such proposed substitute. <br />F. CONTRACTOR's Expense: CONTRACTOR <br />shall provide all data in support of any proposed <br />substitute or "or -equal" at CONTRACTOR's expense. <br />6.06 Concerning Subcontractors, Suppliers, <br />and Others <br />A. CONTRACTOR shall not employ any <br />Subcontractor, Supplier, or other individual or entity <br />(including those acceptable to OWNER as indicated <br />in paragraph 6.06.15), whether initially or as a <br />replacement, against whom OWNER may have <br />reasonable objection. CONTRACTOR shall not be <br />required to employ any Subcontractor, Supplier, or <br />other individual or entity to furnish or perform any of <br />the Work against whom CONTRACTOR has reason- <br />able objection. <br />B. If the Supplementary Conditions require the <br />identity of certain Subcontractors, Suppliers, or other <br />individuals or entities to be submitted to OWNER in <br />advance for acceptance by OWNER by a specified <br />date prior to the Effective Date of the Agreement, and <br />if CONTRACTOR has submitted a list thereof in <br />accordance with the Supplementary Conditions, <br />OWNER's acceptance (either in writing or by failing to <br />make written objection thereto by the date indicated <br />for acceptance or objection in the Bidding Documents <br />or the Contract Documents) of any such Subcon- <br />tractor, Supplier, or other individual or entity so <br />identified may be revoked on the basis of reasonable <br />objection after due investigation. CONTRACTOR <br />shall submit an acceptable replacement for the <br />rejected Subcontractor, Supplier, or other individual or <br />entity, and the Contract Price will be adjusted by the <br />difference in the cost occasioned by such <br />replacement, and an appropriate Change Order will <br />be issued or Written Amendment signed. No accep- <br />tance by OWNER of any such Subcontractor, <br />Supplier, or other individual or entity, whether initially <br />or as a replacement, shall constitute a waiver of any <br />right of OWNER or ENGINEER to reject defective <br />Work. <br />C. CONTRACTOR shall be fully responsible to <br />OWNER and ENGINEER for all acts and omissions of <br />the Subcontractors, Suppliers, and other individuals <br />or entities performing or furnishing any of the Work <br />just as CONTRACTOR is responsible for <br />CONTRACTOR's own acts and omissions. Nothing <br />in the Contract Documents shall create for the benefit <br />of any such Subcontractor, Supplier, or other <br />individual or entity any contractual relationship be- <br />tween OWNER or ENGINEER and any such <br />Subcontractor, Supplier or other individual or entity, <br />nor shall it create any obligation on the part of <br />OWNER or ENGINEER to pay or to see to the <br />payment of any moneys due any such Subcontractor, <br />Supplier, or other individual or entity except as may <br />otherwise be required by Laws and Regulations. <br />D. CONTRACTOR shall be solely responsible <br />for scheduling and coordinating the Work of Subcon- <br />tractors, Suppliers, and other individuals or entities <br />performing or furnishing any of the Work under a <br />direct or indirect contract with CONTRACTOR. <br />E. CONTRACTOR shall require all Subcontrac- <br />tors, Suppliers, and such other individuals or entities <br />performing or furnishing any of the Work to commu- <br />nicate with ENGINEER through CONTRACTOR. <br />F. The divisions and sections of the Specifica- <br />tions and the identifications of any Drawings shall not <br />control CONTRACTOR in dividing the Work among <br />Subcontractors or Suppliers or delineating the Work <br />to be performed by any specific trade. <br />00700-21 <br />F1EngineeringVWilliamsWMa rContrad\Master Contract DocumentsVD0700- General Conditions REV 04-07.doe <br />00700 -General Conditions REV 04-07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.