My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (2)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:32:24 AM
Creation date
9/30/2015 11:52:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (2)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6829
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
171 <br />LA <br />w <br />41111111 <br />M <br />L:7 <br />7 <br />2. giving directions or instructions, or <br />failing to give them, if that is the primary cause <br />of the injury or damage. <br />ARTICLE 7 - OTHER WORK <br />7.01 Related Work at Site <br />A. OWNER may perform other work related to <br />the Project at the Site by OWNER's employees, or let <br />other direct contracts therefor, or have other work <br />performed by utility owners. If such other work is not <br />noted in the Contract Documents, then: <br />1. written notice thereof will be given to <br />CONTRACTOR prior to starting any such other <br />work; and <br />2. if OWNER and CONTRACTOR are <br />unable to agree on entitlement to or on the <br />amount or extent, if any, of any adjustment in <br />the Contract Price or Contract Times that <br />■. should be allowed as a result of such other <br />work, a Claim may be made therefor as <br />provided in paragraph 10.05. <br />M <br />M <br />M <br />0 <br />M <br />w <br />M <br />B. CONTRACTOR shall afford each other <br />contractor who is a party to such a direct contract and <br />each utility owner (and OWNER, if OWNER is per- <br />forming the other work with OWNER's employees) <br />proper and safe access to the Site and a reasonable <br />opportunity for the introduction and storage of <br />materials and equipment and the execution of such <br />other work and shall properly coordinate the Work <br />with theirs. Unless otherwise provided in the Contract <br />Documents, CONTRACTOR shall do all cutting, <br />fitting, and patching of the Work that may be required <br />to properly connect or otherwise make its several <br />parts come together and properly integrate with such <br />other work. CONTRACTOR shall not endanger any <br />work of others by cutting, excavating, or otherwise <br />altering their work and will only cut or alter their work <br />with the written consent of ENGINEER and the others <br />whose work will be affected. The duties and <br />responsibilities of CONTRACTOR under this <br />paragraph are for the benefit of such utility owners <br />and other contractors to the extent that there are <br />comparable provisions for the benefit of <br />CONTRACTOR in said direct contracts between <br />OWNER and such utility owners and other <br />contractors. <br />C. If the proper execution or results of any part <br />of CONTRACTOR's Work depends upon work per- <br />00700-27 <br />er- <br />formed by others under this Article 7, CONTRACTOR <br />shall inspect such other work and promptly report to <br />ENGINEER in writing any delays, defects, or deficien- <br />cies in such other work that render it unavailable or <br />unsuitable for the proper execution and results of <br />CONTRACTOR's Work. CONTRACTOR's failure to <br />so report will constitute an acceptance of such other <br />work as fit and proper for integration with <br />CONTRACTOR's Work except for latent defects and <br />deficiencies in such otherwork. <br />7.02 Coordination <br />A. If OWNER intends to contract with others for <br />the performance of other work on the Project at the <br />Site, the following will be set forth in Supplementary <br />Conditions: <br />1. the individual or entity who will have <br />authority and responsibility for coordination of <br />the activities among the various contractors will <br />be identified; <br />2. the specific matters to be covered by <br />such authority and responsibility will be <br />itemized; and <br />3. the extent of such authority and <br />responsibilities will be provided. <br />B. Unless otherwise provided in the <br />Supplementary Conditions, OWNER shall have sole <br />authority and responsibility for such coordination. <br />ARTICLE 8 - OWNER'S RESPONSIBILITIES <br />8.01 Communications to Contractor <br />A. Except as otherwise provided in these <br />General Conditions, OWNER shall issue all communi- <br />cations to CONTRACTOR through ENGINEER. <br />8.02 Replacement of ENGINEER <br />A. In case of termination of the employment of <br />ENGINEER, OWNER shall appoint an engineer to <br />whom CONTRACTOR makes no reasonable <br />objection, whose status under the Contract <br />Documents shall be that of the former ENGINEER. <br />00700-27 <br />F:\EngineedngV illiams\MasterContrac6Master Contract DocumentsW0700- General ContlNons REV 04.07.doc <br />00700 -General Conditions REV 04-07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.