My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (2)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:10:41 AM
Creation date
9/30/2015 11:52:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (2)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6829
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. giving directions or instructions, or formed by others under this Article 7 , CONTRACTOR <br /> failing to give them, if that is the primary cause shall inspect such other work and promptly report to <br /> of the injury or damage. ENGINEER in writing any delays, defects, or deficien- <br /> cies in such other work that render it unavailable or <br /> unsuitable for the proper execution and results of <br /> ARTICLE 7 - OTHER WORK CONTRACTOR's Work. CONTRACTOR's failure to <br /> so report will constitute an acceptance of such other <br /> _ work as fit and proper for integration with <br /> CONTRACTOR's Work except for latent defects and <br /> 7 .01 Related Work at Site deficiencies in such other work. <br /> A. OWNER may perform other work related to 7.02 Coordination <br /> the Project at the Site by OWNER's employees, or let <br /> other direct contracts therefor, or have other work A. If OWNER intends to contract with others for <br /> performed by utility owners . If such other work is not the performance of other work on the Project at the <br /> noted in the Contract Documents, then : Site, the following will be set forth in Supplementary <br /> Conditions: <br /> 1 . written notice thereof will be given to <br /> • CONTRACTOR prior to starting any such other 1 . the individual or entity who will have <br /> work; and authority and responsibility for coordination of <br /> the activities among the various contractors will <br /> so 2. if OWNER and CONTRACTOR are be identified ; <br /> unable to agree on entitlement to or on the <br /> amount or extent, if any, of any adjustment in 2. the specific matters to be covered by <br /> the Contract Price or Contract Times that such authority and responsibility will be <br /> ■. should be allowed as a result of such other itemized ; and <br /> work, a Claim may be made therefor as <br /> provided in paragraph 10.05. 3 . the extent of such authority and <br /> responsibilities will be provided . <br /> B. CONTRACTOR shall afford each other <br /> contractor who is a party to such a direct contract and B . Unless otherwise provided in the <br /> each utility owner (and OWNER, if OWNER is per- Supplementary Conditions, OWNER shall have sole <br /> M forming the other work with OWNER's employees) authority and responsibility for such coordination . <br /> proper and safe access to the Site and a reasonable <br /> opportunity for the introduction and storage of <br /> materials and equipment and the execution of such ARTICLE 8 - OWNER' S RESPONSIBILITIES <br /> other work and shall properly coordinate the Work <br /> with theirs . Unless otherwise provided in the Contract _ <br /> Documents , CONTRACTOR shall do all cutting , <br /> M* fitting , and patching of the Work that may be required 8.01 Communications to Contractor <br /> to properly connect or otherwise make its several <br /> parts come together and properly integrate with such A. Except as otherwise provided in these <br /> other work. CONTRACTOR shall not endanger any General Conditions, OWNER shall issue all communi- <br /> work of others by cutting, excavating , or otherwise cations to CONTRACTOR through ENGINEER. <br /> altering their work and will only cut or alter their work <br /> with the written consent of ENGINEER and the others 8.02 Replacement of ENGINEER <br /> r whose work will be affected . The duties and <br /> responsibilities of CONTRACTOR under this A. In case of termination of the employment of <br /> paragraph are for the benefit of such utility owners ENGINEER, OWNER shall appoint an engineer to <br /> and other contractors to the extent that there are whom CONTRACTOR makes no reasonable <br /> comparable provisions for the benefit of objection, whose status under the Contract <br /> CONTRACTOR in said direct contracts between Documents shall be that of the former ENGINEER. <br /> OWNER and such utility owners and other <br /> contractors. <br /> C . If the proper execution or results of any part <br /> of CONTRACTOR's Work depends upon work per- <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 27 <br /> F:\EngineedngV W illiams\MasterContrac6Master Contract DocumentsW0700 - General ContlNons REV 04.07.doc <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.