right of OWNER to stop the Wo <br />OWNER to exercise this right <br />` Subcontractor, any Supplier, any <br />employee or agent of any of them. <br />14.02 Progress Payments <br />Work <br />shall not give rise to any duty on the part of <br />for the benefit of CONTRACTOR, any <br />other individual or entity, or any surety for, or <br />SC -14.02.B.5. <br />Delete paragraph <br />GC-14.02.B.5.d in its entirety and insert the <br />following <br />paragraph <br />in its place: <br />delete <br />the remainder of paragraph 14.04A in its entirety <br />and <br />replace <br />Ml d. ENGINEER has actual knowledge of the occurrence of any of the events <br />enumerated in paragraph 15.02.A; or <br />r SC -14.02.8.5. Add the following sentences at the end of paragraph GC-14.02,B.5.- <br />e. <br />C-14.02.8.5:e. OWNER has been required to pay ENGINEER or ENGINEER's Consultant <br />additional compensation because of CONTRACTOR delays or rejection of <br />defective Work; or <br />f. OWNER has been required to pay an independent testing laboratory for <br />subsequent inspections, tests, or approvals taken after initial failing <br />inspections, tests, or approvals. <br />SC -14.02.C.1. Delete paragraph GC -14.02.C.1 in its entirety and insert the following <br />paragraph in its place: <br />C. Payment Becomes Due <br />1. Payment shall be made by OWNER to CONTRACTOR according to the Florida <br />w Prompt Payment Act. <br />M <br />M <br />M <br />M <br />M <br />SC -14.04A. <br />After the third sentence in <br />paragraph <br />GC -14.04A <br />of the General Conditions, <br />delete <br />the remainder of paragraph 14.04A in its entirety <br />and <br />replace <br />with the following: <br />"If Engineer considers the Work substantially complete, Engineer will prepare <br />and deliver to Owner a tentative certificate of Substantial Completion that shall fix <br />the date of Substantial Completion. In accordance with the provisions of Florida <br />Statutes section 208.735(7)(a)(2005), upon receipt of the tentative certificate of <br />Substantial Completion from Engineer, the Owner, the Engineer, and the <br />Contractor shall conduct a walk-through inspection of the Project to document a <br />list of any items required to render the Work on the Project complete, <br />satisfactory, and acceptable under this Agreement (herein the "Statutory List"). <br />The Statutory List shall be reduced to writing and circulated among the Owner, <br />the Engineer, and the Contractor by the Owner or the Engineer within 30 <br />calendar days after substantial completion. The Owner and Contractor <br />acknowledge and agree that: 1) the failure to include any corrective work, or <br />pending items that are not yet completed, on the Statutory List does not alter the <br />responsibility of the Contractor to complete all of the Work under this Agreement; <br />2) upon completion of all items on the Statutory List, the Contractor may submit a <br />pay request for all remaining retainage except as otherwise set forth in this <br />Agreement; and 3) any and all items that require correction under this Agreement <br />and that are identified after the preparation of the Statutory List remain the <br />obligation of the Contractor to complete to the Owner's satisfaction under this <br />Agreement. After receipt of the Statutory List by the Contractor, the Contractor <br />00800-7 <br />00800 - Supplementary conditions REV 04-07.doc <br />00800 7F:1EngineednglCapw Projects 11 -CR 512 Wlden4ig%611 CR 612 PHASE MCon12M DocumeMs100800 - SupplementaryConditions REV 04 07.doc <br />