My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:12:15 AM
Creation date
9/30/2015 11:52:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (3)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting Specifications and Contract
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6830
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> B . The CONTRACTOR shall carefully preserve all control stakes , benchmarks , <br /> reference points and property corners and will be responsible for any mistake or <br /> r loss of time caused by their unnecessary loss or disturbance . If the loss or <br /> disturbance of the stakes or marks cause a delay in the Work , the <br /> r CONTRACTOR shall have no claim for damages or extension of time . Control <br /> stakes , benchmarks , reference points and property corners disturbed by the <br /> CONTRACTOR's work shall be replaced by a Florida Registered Land Surveyor <br /> and Mapper, at the CONTRACTOR's expense . In the event the Owner must <br /> provide the services of the Florida Registered Surveyor and Mapper to perform <br /> this replacement work, the cost of the surveying services will be deducted from <br /> ,,. any sums due the CONTRACTOR for the work performed Under this Contract. <br /> C . All survey work shall be performed under the guidance and direction of a Florida <br /> up Registered Surveyor and Mapper. <br /> D . All survey work for Record Drawings shall be performed by a Florida Registered <br /> Surveyor and Mapper. <br /> 1 . 3 STATION BOARDS <br /> A. CONTRACTOR shall erect and maintain white/black standard FDOT station <br /> markers every 100 feet. <br /> r <br /> 1 .4 LAYOUT OF STRIPING <br /> Establish by instrument, and mark the finished surface , the points necessary for <br /> r striping finished roadway in conformance with Section 5-7 of FDOT Standard <br /> Specifications . <br /> r <br /> r <br /> + + END OF SECTION + + <br /> r <br /> r <br /> r <br /> r <br /> 1050-2 01050 Field Engineering <br /> r F:1EngineeringlCapital PrgeG \9611-CR 512 Widening19611 CR 512 PHASE J=ontract Documents\01050 - Field Engineering.doc <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.