Laserfiche WebLink
n <br />0 <br />r <br />M <br />SECTION 01541 <br />PROTECTION OF THE WORK AND PROPERTY <br />damage to them and to prevent interruption of the services which such <br />structures provide. If CONTRACTOR damages an underground structure, <br />restore it to original condition at CONTRACTOR's expense. <br />7. Necessary changes in the location of the Work may be made by <br />ENGINEER, to avoid unanticipated underground structures. <br />8. If permanent relocation of an underground structure or other subsurface <br />facility is required and is not otherwise provided for in the Contract <br />Documents, ENGINEER will direct CONTRACTOR in writing to perform the <br />Work, which shall be paid for under the provisions of Article 11 of the <br />General Conditions. <br />B. Surface Structures: <br />Surface structures are defined as structures or facilities above the ground <br />surface. Included with such structures are their foundations and any <br />extension below the surface. Surface structures include, but are not limited <br />to, buildings, tanks, walls, bridges, roads, dams, channels, open drainage, <br />piping, poles, wires, posts, signs, markers, curbs, walks and all other facil- <br />ities that are visible above the ground surface. <br />M <br />M <br />1.6 DAMAGE TO EXISTING STRUCTURES AND UTILITIES <br />01541-4 F\Engineering\Capital Projects\9611-CR 512 Widening\9611 <br />CR 512 PHASE MContract Documents\01541 - Protection of Property.doc <br />C. Protection of Underground and Surface Structures: <br />1. Sustain in their places and protect from direct or indirect injury, all <br />underground and surface structures located within or adjacent to the limits <br />of the Work. Such sustaining and supporting shall be done carefully, and as <br />required by the party owning or controlling such structure. Before <br />proceeding with the work of sustaining and supporting such structure, satisfy <br />the ENGINEER that the methods and procedures to be used have been <br />approved by the party owning same. <br />AV <br />2. Assume all risks attending the presence or proximity of all underground and - <br />surface structures within or adjacent to the limits of the Work. <br />CONTRACTOR shall be responsible for all damage and expense for direct <br />or indirect injury caused by its Work to any structure. CONTRACTOR shall <br />repair immediately all damage caused by his work, to the satisfaction of the <br />OWNER of the damaged structure. <br />W, <br />D. All other existing surface facilities, including but not limited to, guard rails, posts, <br />guard cables, signs, poles, markers, and curbs which are temporarily removed to <br />facilitate installation of the Work shall be replaced and restored to their original <br />condition at CONTRACTOR'S expense. <br />M <br />M <br />1.6 DAMAGE TO EXISTING STRUCTURES AND UTILITIES <br />01541-4 F\Engineering\Capital Projects\9611-CR 512 Widening\9611 <br />CR 512 PHASE MContract Documents\01541 - Protection of Property.doc <br />