Laserfiche WebLink
W <br />r SECTION 01610 <br />TRANSPORTATION AND HANDLING OF MATERIALS AND EQUIPMENT <br />0 <br />F. Partial deliveries of component parts of equipment shall be clearly marked to <br />I, identify the equipment, to permit easy accumulation of parts, and to facilitate <br />assembly. <br />r G. Immediately on delivery, inspect shipment to assure: <br />1. Product complies with requirements of Contract Documents and reviewed <br />submittals. <br />.r 2. Quantities are correct. <br />3. Containers and packages are intact, labels are legible. <br />4. Products are properly protected and undamaged. <br />i <br />1.3 PRODUCT HANDLING <br />•r A. Provide equipment and personnel necessary to handle products, including <br />those provided by OWNER, by methods to prevent soiling or damage to <br />products or packaging. <br />r <br />B. Provide additional protection during handling as necessary to prevent scraping, <br />marring or otherwise damaging products or surrounding surfaces. <br />C. Handle products by methods to prevent bending or overstressing. <br />D. Lift heavy components only at designated lifting points. <br />E. Materials and equipment shall at all times be handled in a safe manner and as <br />recommended by manufacturer or supplier so that no damage will occur to <br />them. Do not drop, roll or skid products off delivery vehicles. Hand carry or use <br />r <br />suitable materials handling equipment. <br />+ + END OF SECTION + + <br />r <br />J <br />01610-2 <br />FAEngineeringSCapital Projects19611-CR 512 Widening\9611 CR 512 PHASE I\AContract Documents\01610 - Transportation and <br />i Handling of Materials and Equipment.doc <br />W <br />