Laserfiche WebLink
r <br /> SECTION 01710 <br /> r <br /> SITE CLEANUP AND RESTORATION <br /> 1 . 1 SCOPE <br /> Furnish all labor, equipment, appliances, and materials required or necessary to <br /> clean up and restore the site after the construction is completed . <br /> 1 . 2 REQUIREMENTS <br /> A. During the progress of the project, keep the work and, the adjacent areas <br /> affected thereby in a neat and orderly condition . Remove all rubbish , <br /> surplus materials , and unused construction equipment. Repair all damage <br /> so that the public and property owners will be inconvenienced as little as <br /> possible . <br /> B . Provide onsite containers for the collection of waste materials , debris , and <br /> rubbish and empty such containers in a legal manner when they become <br /> full . <br /> C . Where material or debris has been deposited in watercourses , ditches , <br /> gutters , drains , or catch-basins as a result of the CONTRACTOR's <br /> operations , such material or debris shall be entirely removed and <br /> satisfactorily disposed of during the progress of the work, and the ditches , <br /> channels, drains, etc. , shall be kept clean and open at all times . <br /> D . Before the completion of the project, unless otherwise especially directed <br /> or permitted in writing : <br /> 1 . Tear down and remove all temporary buildings and structures ; <br /> 2 . Remove all temporary works, tools , and machinery , or other <br /> construction equipment furnished ; <br /> 3 . Remove all rubbish from any grounds occupied ; and <br /> 4 . Leave the roads, all parts of the premises , and adjacent property <br /> affected by construction operations , in a neat and satisfactory <br /> ,,. condition . <br /> E . Restore or replace any public or private property damaged by construction <br /> r. work, equipment, or employees , to a condition at least equal to that <br /> existing immediately prior to the beginning of the operations . To this end , <br /> the CONTRACTOR shall restore all highway , roadside , and landscaping <br /> • work within any right-of-way , platted or prescriptive . Acceptable materials , <br /> equipment , and methods shall be used for such restoration . <br /> • F . Thoroughly clean all materials and equipment installed and on completion <br /> of the work, deliver the facilities undamaged and in fresh and new- <br /> appearing condition . <br /> 01710 Site Cleanup <br /> 01710-1 <br /> F\Engineering\Capital Projects\9611-CR 512 Widenin9\9611 CR 512 PHASE MContract Documents\01710 - Site Cleanup.doc <br />