Laserfiche WebLink
r - <br />DATE OF ISSUANCE: <br />SECTION 00948 - Work Change Directive <br />EFFECTIVE DATE: <br />No. <br />OWNER: Indian River County <br />CONTRACTOR: <br />Bid Number: 2008012 <br />' Project: CR 512, Phase IV Roadway Improvements <br />OWNER's Contract No. ENGINEER'S Contract No. N/A <br />ENGINEER: IRC <br />r <br />You are directed to proceed promptly with the following changes: <br />Description: <br />to <br />Purpose of Work Change Directive: <br />177 <br />Attachments: (List documents supporting change) <br />• <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices: <br />Unit Prices <br />w ❑ Lump Sum <br />❑ Other:_ <br />❑ By Change Order: <br />Estimated increase (decrease) in Contract Price: <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />RECOM <br />By: <br />W <br />(Authorized <br />Method of determining change in <br />Contract Times <br />Q Contractor's Records <br />Q Engineer's Records <br />❑ Other:_ <br />❑ By Change Order: <br />Estimated increase (decrease) in Contract Times: <br />Substantial Completion: days; <br />Ready for Final Completion: _ days. <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />AUTHORIZED: <br />By: <br />* * END OF SECTION * * <br />Signature) <br />1r F:\Engineering\Capital Projects\9611-CR 512 Widening\9611 CR 512 PHASE IV\Contmct Documents\00948 - Work Change <br />Directive REV 04-07.doc <br />