Laserfiche WebLink
C. Inlet (DT Bottom Type C D Modified E . and H Modified): Structures shall be constructed <br /> as per FDOT Index 232. <br /> Payment shall be made under: <br /> r Item No . 425-1 -521 Inlet (DT Bottom Type C)(< 10') Per Each <br /> Item No. 425- 1 -542 Inlet (DT Bottom Type D )(< 10' ) Per Each <br /> Item No. 425-1 -549 Inlet ( DT Bottom Type D Modified )(< 10') Per Each <br /> Item No. 425- 1 -571 Inlet (DT Bottom Type G )(< 10') Per Each <br /> Item No . 425- 1 -573 Inlet (DT Bottom Type G Modified)(< 10') Per Each <br /> D . Manholes : Price shall include all work associated with constructing and installing manholes <br /> and covers . The covers shall have raised letters , cast in the cover stating "STORM <br /> SEWER." <br /> Payment shall be made under: <br /> r Item No . 425-2-041 Manhole (Type P-8 ) (< 10' ) Per Each <br /> Item No. 425-2-042 Manhole (Type P-7) (> 10' ) Per Each <br /> r <br /> E . Adiust Manholes: Price shall include all work associated with adjusting existing manhole <br /> ring and cover to proposed grades as depicted on the Engineering Plans. <br /> r <br /> Payment shall be made under: <br /> r Item No . 425-5 Adjusting Manholes Per Each <br /> Item No . 425-5- 1 Adjusting Manholes (Utilities) Per Each <br /> r SECTION 430 <br /> r <br /> PIPE CULVERTS AND STORM SEWERS <br /> A. Concrete Pipe Culvert (Class III ) RCP/Corrugated Aluminum Culvert & Mitered End <br /> Section: The concrete pipe culvert, Class III , shall be constructed in accordance with <br /> • Designation C-76 , Class III , Wall B . Corrugated aluminum culvert & mitered end section <br /> shall be Group 12 . Any select bedding needed to stabilize pipe to be #57 or #4 rock. <br /> Select bedding will be included in the cost of the pipe. Minimum bedding depth to be 18" <br /> • and minimum width to be diameter of pipe. Cost of removal of unsuitable material beneath <br /> 18" bedding shall be paid for as subsoil excavation Item No. 120-4. <br /> r The work under this Section shall include all materials, excavation , backfilling , tamping and <br /> disposal of surplus material. All required sheeting is to be included in the cost of pipe. <br /> Such price and payment shall be full compensation for all work in this Section . <br /> r <br /> r <br /> a <br />