Laserfiche WebLink
• <br />"The quantities of pipe culvert to be paid for under this Section shall be the plan quantity in <br />feet of concrete Pipe Culvert and Corrugated Aluminum Pipe Culvert subject the provisions <br />of 9-3.2. Any additions or deletions thereto, as authorized by the Engineer, shall be <br />• <br />determined by plan dimensions, final measurement, or any combination thereof, as <br />measured along the centerline of the completed and accepted pipe." <br />• <br />Lifting holes on pipe culverts shall be grounds for rejection of pipe. ASTM Specification C- <br />76 -85A and AASTM Specification M170-89 are modified by the following: <br />" <br />"The exposure of the ends of the longitudinal stirrups or spaces that have been used to <br />position the cages during the placement of the concrete may be a cause for rejection by the <br />Project Engineer. <br />During construction, the Contractor is to maintain the storm sewer void of any silting <br />material. Prior to final acceptance the Contractor or Engineer shall inspect and certify that <br />• <br />the storm sewer is free of any construction material or debris and operates in a functional <br />manner. Contractor shall remove silt and other material from sewer at no cost to Owner. <br />Compensation shall be included in the maintenance of traffic lump sum item. <br />• <br />D. Aluminum Oil Skimmers: Aluminum Oil Skimmers shall be used where indicated in the <br />plans and shall conform to the following provisions: <br />The Work consists of the fabrication, cutting, bending, furnishing and installing oil skimmers <br />on drainage structures as detailed on the Plans. The Contractor shall use all new materials <br />for the posts and facing materials for the oil skimmer. The Contractor is responsible for the <br />• <br />use of materials and methods necessary for the long term maintainability of the units. <br />Oil skimmers shall be constructed of corrugated aluminum. They shall be constructed to <br />• <br />the liens and grades as shown on the Plans. The skimmers include all labor and materials <br />including mounting fasteners, brackets, posts bonding adhesives, Class III concrete for <br />posts and all other items necessary for the construction of the completed skimmer. <br />• <br />Material <br />• <br />The skimmers shall be constructed of 12 gauge 2-2/3" x'/:" corrugated aluminum. <br />r <br />Basis of Payment <br />The compensation for the furnishing, bending, fabrication and installation of materials as well as <br />the labor involved for placement are considered incidental to the contract drainage items as <br />shall be included in the unit price for the associated drainage structure. <br />r <br />• <br />• <br />C <br />