Laserfiche WebLink
r necessary miscellaneous hardware specified in the Contract Documents, plus all shipping and <br /> handling costs involved in delivery as specified in the Contract Documents <br /> r. 635-6.4 Install: The Contract unit price each for Pull and Junction Box, installed, will <br /> include the cost of all labor, equipment, miscellaneous hardware and materials necessary to make <br /> a complete and accepted installation of the type box and at locations as shown on the plans. The <br /> r Engineer will supply a complete box as specified in the Contract Documents. <br /> 635-7 Basis of Payment. <br /> Price and payment will be full compensation for all work specified in this Section, except <br /> ~ grounding. Payment for embedded junction boxes will not be made separately. <br /> The Contractor shall include the cost of embedded junction boxes in the Contract unit <br /> r price for the concrete substructure or superstructure items_ <br /> Payment will be made under: <br /> Item No. 635- 1 - 11 Pull and Junction Boxes - per each <br /> r Item No. 635- 1 - 15 Slack/Splice Boxes - per each. <br /> w <br /> r <br /> r <br /> r <br /> rr <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br />