Laserfiche WebLink
N <br />14. It is the Contractors responsibility to contact the various utility companies which may <br />have buried or aerial utilities within or near the construction area before commencing <br />work. The Contractor shall provide 48 hours minimum notice to the utility companies <br />prior to beginning construction. A list of the utility companies which the Contractor must <br />call before commencing work is provided below. This list serves as a guide only and is <br />not intended to limit the utility companies which the Contractor may wish to notify. <br />• Florida Power & Light <br />• Indian River County Utilities <br />Indian River County Traffic Engineering <br />• BellSouth <br />Comcast <br />• City of Sebastian <br />• Florida Gas Transmission <br />15. Contractor shall be responsible to obtain all required construction permits and bonds <br />prior to construction. <br />• 16. Contractor shall have available at the job site, at all times, one copy of the contract <br />documents including plans, specifications and special provisions, copies of any required <br />construction permits, and a copy of the Indian River County Water and Wastewater <br />• Utility Standards, latest revision. <br />17. Any discrepancies on the drawings shall be immediately brought to the attention of the <br />Engineer before commencing work. No field changes or deviations from design are to <br />be made without prior approval of the Engineer. <br />r 18. All copies of compaction, concrete and other required test results are to be sent to the <br />appropriate site inspector/engineering department and design Engineer of Record <br />directly from the testing agency. <br />19. Contractor shall be responsible for submitting to the Engineer, five (5) certified copies of <br />the as -built survey by a Professional Land Surveyor Registered in the State of Florida <br />depicting the actual field location of all constructed improvements. The as -built drawings <br />shall be prepared in digital format, AUTOCAD release 12 or later, and made available to <br />the Engineer for the Owner's or other government agency's records. As-builts shall <br />meet all local codes. <br />20. Bacteriological sample points shall be placed as required by FDEP and Indian River <br />County. <br />r. <br />21. Utility services shall be maintained throughout construction. <br />„ 22. Temporary jumper shall be installed and new line constructed, tested and cleared. <br />Upon clearance, valves, on each side of new line shall be closed, keeping active service <br />through construction. <br />rr <br />23. All joints for force main and water main shall be restrained type as indicated on the <br />drawings, and bell and spigot type, except as noted as flanged when above ground. <br />r <br />M. <br />