Laserfiche WebLink
N <br /> 14. It is the Contractors responsibility to contact the various utility companies which may <br /> have buried or aerial utilities within or near the construction area before commencing <br /> work. The Contractor shall provide 48 hours minimum notice to the utility companies <br /> prior to beginning construction. A list of the utility companies which the Contractor must <br /> call before commencing work is provided below. This list serves as a guide only and is <br /> not intended to limit the utility companies which the Contractor may wish to notify. <br /> • Florida Power & Light <br /> Indian River County Utilities <br /> • Indian River County Traffic Engineering <br /> BellSouth <br /> Comcast <br /> • City of Sebastian <br /> Florida Gas Transmission <br /> 15. Contractor shall be responsible to obtain all required construction permits and bonds <br /> prior to construction . <br /> • 16 . Contractor shall have available at the job site, at all times, one copy of the contract <br /> documents including plans, specifications and special provisions , copies of any required <br /> construction permits, and a copy of the Indian River County Water and Wastewater <br /> • Utility Standards, latest revision . <br /> 17 . Any discrepancies on the drawings shall be immediately brought to the attention of the <br /> Engineer before commencing work. No field changes or deviations from design are to <br /> be made without prior approval of the Engineer. <br /> .. 18 . All copies of compaction, concrete and other required test results are to be sent to the <br /> appropriate site inspector/engineering department and design Engineer of Record <br /> directly from the testing agency. <br /> 19 . Contractor shall be responsible for submitting to the Engineer, five (5) certified copies of <br /> the as-built survey by a Professional Land Surveyor Registered in the State of Florida <br /> depicting the actual field location of all constructed improvements. The as-built drawings <br /> shall be prepared in digital format, AUTOCAD release 12 or later, and made available to <br /> the Engineer for the Owner's or other government agency's records. As-builts shall <br /> meet all local codes. <br /> 1W <br /> 20. Bacteriological sample points shall be placed as required by FDEP and Indian River <br /> County. <br /> r . <br /> 21 . Utility services shall be maintained throughout construction. <br /> „ 22. Temporary jumper shall be installed and new line constructed, tested and cleared . <br /> Upon clearance , valves, on each side of new line shall be closed, keeping active service <br /> through construction. <br /> rr <br /> 23. All joints for force main and water main shall be restrained type as indicated on the <br /> drawings, and bell and spigot type, except as noted as flanged when above ground. <br /> r <br />