My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:18:25 AM
Creation date
9/30/2015 11:53:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (4)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6831
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{ SPECIAL CONDITIONS <br />'i <br /> CR 512 Corridor Improvement <br /> PERMIT NO. 2007-A-490-0008 State Section No. : 88081 <br /> ❑ During construction, highest priority should be given to ensure pedestrian <br /> safety. If permission is granted to temporarily close a sidewalk, it should be <br /> done with the express condition that an alternate route will be provided, and <br /> shall continuously maintain pedestrian features to meet Americans with <br /> Disability Act (ADA) standards. <br /> ❑ The D.O.T. right-of-way cannot be utilized for on-site construction. <br /> ❑ The D. O.T. roadway, sidewalk, etc. must not be disturbed until the of site <br /> improvements shown on the permit are ready to be constructed. This <br /> construction should be completed as scion as possible so as to minimize <br /> disruption within the RfW, <br /> ❑ A copy of this permit and plan will be on the job site at all times during the <br /> construction of this facility. <br /> ❑ This permit is valid only for work proposed within the D.O.T. right-off-way. <br /> Contact Mr. FERNANDO O3EDA 772-633-5334 to schedule a pre- <br /> construction conference. Certification acceptance and final approval is <br />+� contingent upon conformity of all work done according to this permit. <br /> IM ❑ Permittee is cautioned that utilities may be located within the construction <br /> area. <br /> ❑ Validity of this permit is contingent upon permittee obtaining necessary <br /> permits from all other agencies involved. <br /> ❑ Before beginning any work the signal maintaining agency must be notified to <br /> establish the location of any signal loops, wires, system communications, etc. <br /> ❑ Contain all erosion and sedimentation on-site and prevent its entry into the <br /> state road storm sewer system. <br /> ❑ Give Special attention to MOT note instructing that the local media shall be <br /> contacted a week prior to any lane closures on the state road system if it will <br /> occur during peak hours or over the span of more than one day. Contact <br /> Barbara Kelleher, FDDT Public Information Office at 954-7774090 for <br /> guidance on who to contact. Provide a copy of the press release to: <br /> Florida Department of Transportation <br /> Public Information Office <br /> 3400 West Commercial Blvd. <br /> Fort Lauderdale, Florida 33309 <br /> District Four — Permits <br /> 05/24/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.