My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:18:25 AM
Creation date
9/30/2015 11:53:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (4)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6831
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• AAo�QN Charlie Crist <br /> Florida Department of Governor <br /> • Environmental Protection leaf Kottkamp <br /> Lt . Governor <br /> Central District <br /> FLOR A k 3319 Maguire Boulevard, Suite 232 Michael W. Sole <br /> Orlando, Florida 32803-3767 Secretary <br /> Notifirat on ofTTSP Of G" Puarnl PP mit <br /> • SENT BY E-MAIL <br /> Permittee: Gordon Sparks, Indian River County utilities <br /> Utility: Indian River County Utilities <br /> • Engineer: Stephen Moler, P .E., Masteller & Moler, Inc. <br /> Permit Number: WD31 -0039206-689 <br /> • Project Name: CR 512 Corridor Improvements Phase IV <br /> County: Indian River <br /> Project Description: Fourteen branches off the existing 20-inch main along CR 512 between STA 43+00 <br /> • and 139+00 <br /> To the Permittee: Gordon Sparks, Environmental Engineer <br /> • In response to your request, this document is to advise you that the Department has received your <br /> notice of intent to use a general permit as provided in Chapter 62-555 , Florida Administrative Code <br /> (FA. C.), to construct a water distribution system extension and is not at this time objecting to your use of <br /> • such general permit. Please be advised that you are required to abide by all conditions in Chapters 62-4, <br /> 62-550, 62-555 , the general requirements for general permits, and Rule 62-555.405 , F.A. C. <br /> A LETTER OF CLEARANCE MUST BE ISSUED BY THE DEPARTMENT PRIOR TO <br /> r PLACEMENT OF THIS PROJECT INTO SERVICE. FAILURE TO DO SO WILL RESULT IN <br /> THE PERMITTEE BEING SUBJECT TO APPROPRIATE ENFORCEMENT ACTION. <br /> To obtain the clearance letter, the engineer-of-record must submit a "Request for Letter of Release to Place - - <br /> r Water Supply System into Service" [DEP Form 62-555 .900(9), FR. C.] (Attached), a copy of this letter and <br /> satisfactory bacteriological test results (with chlorine residuals indicated) taken on two consecutive days from the <br /> proposed mains at the 11 sampling locations designated on the drawings and from one point each on the 8-inch <br /> branches near STA 92+00, 114+00 and 139+00; no hydrant shall be used for sample collection. <br /> r <br /> Water sample forms must indicate specific recommended sample locations and file number above. <br /> Permit expiration date is five years from the date of issuance. <br /> • <br /> Richard S . Lott, P .G., P.E. <br /> Manager — Drinking Water Program <br /> • Date: March 8, 2007 <br /> RSL/ohm/jo <br /> essnarks cr.iregov.com; mastmolt-0,,bellsouthmet: <br /> r <br /> • <br /> More Yriukviu u. Lens Po'arees " <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.