My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (6)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:20:46 AM
Creation date
9/30/2015 11:53:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6832
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 4 - Best Management Practices for Erosion and Sediment Control <br /> r - <br /> Staked and Entrenched <br /> Binding Wire Straw Sale <br /> or-Wine Compacted Soil to <br /> 1 1 Prevent Piping <br /> Fltered Runoff 1 J Sediment Laden <br /> ` Runoff <br /> It <br /> property Installed Straw Bale <br /> r <br /> (Cross-Seoticni <br /> t , Excavate the Trench 2. Place and Stake Straw Bales <br /> r <br /> Angle First- Stake - <br /> - Toward Previously <br /> _ Laid Bale <br /> to <br /> 40 <br /> Flow <br /> Bale <br /> Width- <br /> No <br /> idthr ,*S� <br /> Bacxfill and compact the <br /> Excavated Soil <br /> 3. Wedge Loose Straw Between Between Bales <br /> r <br /> canstrueticn of Straw Bale Barrier <br /> r <br /> Plate 4.45b Construction of a Straw Bale Barrier . <br /> Source: NRCS <br /> r <br /> 4- 15 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.