Laserfiche WebLink
Chapter 4 - Best Management Practices for Erosion and Sediment Control <br /> r - <br /> Staked and Entrenched <br /> Binding Wire Straw Sale <br /> or-Wine Compacted Soil to <br /> 1 1 Prevent Piping <br /> Fltered Runoff 1 J Sediment Laden <br /> ` Runoff <br /> It <br /> property Installed Straw Bale <br /> r <br /> (Cross-Seoticni <br /> t , Excavate the Trench 2. Place and Stake Straw Bales <br /> r <br /> Angle First- Stake - <br /> - Toward Previously <br /> _ Laid Bale <br /> to <br /> 40 <br /> Flow <br /> Bale <br /> Width- <br /> No <br /> idthr ,*S� <br /> Bacxfill and compact the <br /> Excavated Soil <br /> 3. Wedge Loose Straw Between Between Bales <br /> r <br /> canstrueticn of Straw Bale Barrier <br /> r <br /> Plate 4.45b Construction of a Straw Bale Barrier . <br /> Source: NRCS <br /> r <br /> 4- 15 <br /> r <br />