My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (6)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:20:46 AM
Creation date
9/30/2015 11:53:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6832
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 4. - Best Mana ement. Practices for Erosion and Sediment Control <br /> Construction Specifications <br /> Straw bale drop inlet filter <br /> 1 . Bales shall be either wire-bound or string-tied with the bindings oriented around the <br /> sides rather than over and under the bales. <br /> 2. Bales shall be placed lengthwise in a single row surrounding the inlet, with the <br /> r ends of adjacent bales pressed together. (See Plate 4 . 08a) <br /> 3, The filter barrier shall be entrenched and backfilled. A trench shall be excavated <br /> r around the inlet the width of a bale to a minimum depth of 4 inches (10 cm) . After <br /> the bales are staked, the excavated soil shall be backfilled and compacted against <br /> the filter barrier. (See Plate 4.08b) <br /> M 4 , Each bale shall be securely anchored and held in place by at least two stakes or <br /> rebars (See p . 4-17) driven through the bale . <br /> g . Loose straw should be wedged between bales to prevent water from entering <br /> between bales . <br /> 8 . Gravel may be spread around the bates to improve stability. <br /> See Plate 4 . 08c) <br /> .. Fabric drop inlet sediment filter <br /> 1 . Fabric shall be cut from a continuous roll to avoid joints . <br /> �. <br /> 2 , Stakes shall be 2" x 4." (5 pm x 10 cm) wood (preferred) or equivalent metal with a <br /> minimum length of 3 feet (90 cm) . (See Plate 4.08d) <br /> rr <br /> 3 . Staples shall be of heavy duty vvire at least 1I2-inch (13 mm) tong. <br /> 4. Stakes shall be spaced around the perimeter of the inlet a . maximum of 3 feet (90 <br /> cm) apart and securely driven into the ground minimum of 8 inches (20 cm) . A <br /> frame of 2" x 4" (5 cm x 10 cm) wood shall be constructed around the top of the <br /> ,. stakes for proper stability. <br /> 5 . A trench shall be excavated approximately 4 inches (10 cm) wide and 4 inches (10 <br /> cm) deep around the outside perimeter of the stakes. (See Plate 4. 08e) <br /> g . The burlap shall be stapled to thewooden stakes , and 8 inches (20 cm) of the fabric <br /> shall be extended into the trench . The height of the filter barrier shall be a minimum <br /> of 15 inches (38 cm) and shall not exceed 18 inches (45 cm). <br /> .. 7 . The trench shall be backfilled and the soil compacted over the burlap . <br /> 4-37 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.