r. <br />Chapter 4 - Hest. .Management. Practices for Erosion. and.:Sediment.Gontrol. <br />Good timing is essential to fill construction. The filling operation should be completed as <br />quickly as possible and the permanent slope protection measures and slope stabilization <br />measures installed as soon after completion as possible: With quick and proper <br />construction, the developer or contractor will save both time and money in building, <br />repairing and stabilizing the fill area. The longer the time period for construction and <br />stabilization, the more prone the fill operation is to damages by erosion. Repairing the <br />damages adds additional time and expense to the project. <br />` Design Criteria <br />M No formal design is required. The following criteria shall be met: <br />Drainage Area <br />` The maximum allowable drainage area is 5 acres (2 ha). <br />r <br />Height <br />• <br />The minimum height of the supporting. ridge shall be 9 inches (23 cm). (See Plate 4.16a). <br />Grade <br />The channel shall have a positive grade to a stabilized outlet. <br />Outlet <br />The diverted runoff should be released through a stabilized outlet, slope drain or sediment <br />trapping measure. <br />Construction Specifications <br />1. The diversion shall be constructed at the top of the fill at the end of each work day <br />as needed. <br />2. The diversion shall be located at least 2 feet (60 cm) inside the top edge of the fill. <br />(See Plate 4.16a). <br />3. The supporting ridge of the lower side shall be constructed with a uniform height <br />` along its entire length. <br />Maintenance <br />Since the practice is temporary and under most situations will be covered the next work <br />day, the maintenance required should be low. If the practice is to remain in use for more <br />than one day, an inspection will be made at the end of each work day and repairs made to <br />the measure if needed. The contractor should avoid the placement of any material over <br />the structure white it is in use. Construction traffic should not be permitted to cross the <br />diversion. <br />