My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:19:40 AM
Creation date
9/30/2015 11:54:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (5)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6833
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t Practices for! Sediment Contro <br /> Chapter 4 - Best Managemenl . <br /> r <br /> cutoff Trench <br /> For earth fill embankments , a cutoff trench shall be excavated along the centerline of the <br /> dam . The minimum depth shall be 2 feet (60 cm) : The cutoff trench shall extend up both <br /> abutments to the riser crest elevation . The minimum bottom width shall be 4 feet (1 .2 m) , <br /> " but wide enough to allow operation of compaction equipment. The side slopes shall be no <br /> steeper. than 111 . Compaction requirements shall be the same as those for the <br /> embankment. The trench shall be drained during the backfilling-compacting operations . <br /> Embankment <br /> The fill material shall be taken from approved borrow areas . It shall -be clean mineral soil , <br /> free of roots , woodymegetation , oversized stones , rocks , or other objectionable material: <br /> Areas on which fill is to be placed shall be scarified prior to placement. of fill. The fill <br /> material should contain sufficient moisture so that it can be formed by hand into a bail <br /> without crumbling . if water can be squeezed out of the ball , it is too wet for proper <br /> compaction . Fill material will be placed in 6 to 8 inch (15 to 20 cm) continuous layers over <br /> the entire length of the fill . Compaction shall be obtained by routing the hauling equipment <br /> over the fill so that the entire surface of the fill is traversed by at least one wheel or tread <br /> track of the equipment, or by using a compactor. The embankment shall be constructed to <br /> an elevation 10% higher than the design height to allow for settlement if compaction is <br /> obtained 'with hauling. equipment . If compactors are used for compaction, the overbuild <br /> may be reduced to notless 't an <br /> Principal Spillway <br /> The riser of the principal spillway shall be securely attached to the barrel by a watertight <br /> connection . The barrel and riser shall be placed on a firm compacted soil foundation . The <br /> base of the riser shall be firmly anchored according to design criteria to prevent its floating. <br /> Pervious material such as sand , gravel or crushed stone shall not be used as backfill <br /> around the barrel or anti-seep collars . Fill material shall be placed around the pipe in 4 <br /> inch (10 cm) layers and compacted by hand at least to the same density as the <br /> " embankment. A minimum of two feet (60 cm) of fill shall be hand-compacted over the <br /> barrel before crossing it with construction equipment. <br /> Emergency Spillwa <br /> The emergency spillway should not be constructed over fill material . Design elevations, <br /> widths , entrance and exit channel slopes are critical to the successful operation of the <br /> spillway and should be adhered to closely during construction . <br /> Vegetative Stabilization <br /> in <br /> The temporary <br /> vegetation <br /> getaf on within nd 15cdaysllofay of the sediment ompletioIn of the bas nshall <br /> per TEMPORARY <br /> stabilized with <br /> temporary 9 <br /> SEEDING - Section 6 . 65 (ES BMP 1 .65) . <br /> 4-91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.