t Practices for! Sediment Contro <br /> Chapter 4 - Best Managemenl . <br /> r <br /> cutoff Trench <br /> For earth fill embankments , a cutoff trench shall be excavated along the centerline of the <br /> dam . The minimum depth shall be 2 feet (60 cm) : The cutoff trench shall extend up both <br /> abutments to the riser crest elevation . The minimum bottom width shall be 4 feet (1 .2 m) , <br /> " but wide enough to allow operation of compaction equipment. The side slopes shall be no <br /> steeper. than 111 . Compaction requirements shall be the same as those for the <br /> embankment. The trench shall be drained during the backfilling-compacting operations . <br /> Embankment <br /> The fill material shall be taken from approved borrow areas . It shall -be clean mineral soil , <br /> free of roots , woodymegetation , oversized stones , rocks , or other objectionable material: <br /> Areas on which fill is to be placed shall be scarified prior to placement. of fill. The fill <br /> material should contain sufficient moisture so that it can be formed by hand into a bail <br /> without crumbling . if water can be squeezed out of the ball , it is too wet for proper <br /> compaction . Fill material will be placed in 6 to 8 inch (15 to 20 cm) continuous layers over <br /> the entire length of the fill . Compaction shall be obtained by routing the hauling equipment <br /> over the fill so that the entire surface of the fill is traversed by at least one wheel or tread <br /> track of the equipment, or by using a compactor. The embankment shall be constructed to <br /> an elevation 10% higher than the design height to allow for settlement if compaction is <br /> obtained 'with hauling. equipment . If compactors are used for compaction, the overbuild <br /> may be reduced to notless 't an <br /> Principal Spillway <br /> The riser of the principal spillway shall be securely attached to the barrel by a watertight <br /> connection . The barrel and riser shall be placed on a firm compacted soil foundation . The <br /> base of the riser shall be firmly anchored according to design criteria to prevent its floating. <br /> Pervious material such as sand , gravel or crushed stone shall not be used as backfill <br /> around the barrel or anti-seep collars . Fill material shall be placed around the pipe in 4 <br /> inch (10 cm) layers and compacted by hand at least to the same density as the <br /> " embankment. A minimum of two feet (60 cm) of fill shall be hand-compacted over the <br /> barrel before crossing it with construction equipment. <br /> Emergency Spillwa <br /> The emergency spillway should not be constructed over fill material . Design elevations, <br /> widths , entrance and exit channel slopes are critical to the successful operation of the <br /> spillway and should be adhered to closely during construction . <br /> Vegetative Stabilization <br /> in <br /> The temporary <br /> vegetation <br /> getaf on within nd 15cdaysllofay of the sediment ompletioIn of the bas nshall <br /> per TEMPORARY <br /> stabilized with <br /> temporary 9 <br /> SEEDING - Section 6 . 65 (ES BMP 1 .65) . <br /> 4-91 <br />