My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:19:40 AM
Creation date
9/30/2015 11:54:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (5)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6833
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Chapter 4. Best Management. Practices for Erosion and. Sediment Control � ® <br /> Dike Design <br /> 1 . An earthen dike shall be used to direct- stormwater runoff into the temporary slope <br /> drain and shall be constructed according to the practice entitled DIVERSION - <br /> r Section 5 . 18 (ES BMP 1 . 18) . (See Plate 4 .30a) <br /> 2 . The height of the dike at the centerline of the inlet shall be equal to the diameter of <br /> the pipe (D ) plus 6 inches (15 cm) . Where the dike height is greater than 18 inches <br /> (45 cm) at the inlet, it shall be sloped at the rate of 3: 1 or flatter to connect with the <br /> remainder of the dike . (See Plate 4 . 30a) <br /> Outlet Protection <br /> .. The outlet of the slope drain shall be protected from erosion according to the practice <br /> entitled OUTLET PROTECTION . - Section 5 .36 (ES BMP 1 .36) . (See Plate 4. 30b). <br /> .. . Construction Specifications <br /> 1 . The measure shall be placed on undisturbed soil or well-compacted fill . <br /> 2'. The entrance section shall slope towardthe slope drain at the minimum rate of <br /> Yzinch per foot (4 cm/m) . <br /> 1 The soil around and under the entrance section shall be hand-tamped in 8 inch (20 <br /> cm) lifts to the top of the dike to prevent piping failure around the inlet. <br /> 4 . The slope drain shall. be securely staked to the slope at the grommets provided. <br /> 5 . The slope drain sections shall be securely fastened together and have watertight <br /> fittings . <br /> Maintenance <br /> The slope drain structure shall be inspected weekly and after every storm, and shall have <br /> repairs made if necessary . The contractor should avoid the placement of any material on <br /> and prevent construction traffic across the slope. drain .. <br /> i <br /> ' Plan Eiees[Sw <br /> Plate 4.30d Flared End Section Schematic <br /> Source: VDH&T Road Desions and Standards <br /> A 4r) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.