My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:19:40 AM
Creation date
9/30/2015 11:54:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (5)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6833
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Chapter 4 - Best Management Practices. fat Erosiort,and-pediment Control .. . . <br /> _ : - <br /> 4.38 TEMPORARY CHECK DAMS <br /> oefInition <br />. , Small temporary dams constructed across a swale or stormwater conveyance channel . <br /> Epsom <br /> To reduce the velocity of concentrated stormwater flows , thereby reducing erosion of the <br /> Swale or ditch . This practice also traps small amounts of sediment generated in the ditch <br /> .. itself. These sediments will require periodic removal . However, this is not a sediment <br /> trapping practice and should not be used as such . <br /> r Conditions JVhere Fra�tice Apples <br /> This practice is limited:to use in small open channels which drain 10 acres (4 ha) or less . It <br /> .. should not be used in a live stream. This practice is especially applicable to sloping sites <br /> where the gradient of waterways is close to the maximum for a grass lining . Some specific <br /> applications include: <br /> 1 . Temporary ditches orswales which , because of their short length of service , cannot <br /> receive a non-erodible lining but still need some protection to reduce erosion . <br /> r 2. Permanent ditches or swales which for some reason cannot receive a permanent <br /> non-erodible lining for an extended period of time. <br /> r 3 . Either temporary or permanent. ditches or swales which need protection during the <br /> establishment of grass linings. . <br /> Piannino Considerations <br /> .. Temporary check dams can be constructed of filter fence or straw bales far very shortterm <br /> applications ; or either stone or logs for longer or permanent applications . Filterfence and <br /> straw bale check dams are economical to purchase and simple to install. Log .check dams <br /> ,. are economical as for material costs, since logs can usually be salvaged. from clearing <br /> operations. However; log:check dams require more time and hand-labor to install . Stone <br /> for check dams , on the other hand, must generally be purchased . However, this cost is <br /> offset somewhat by the ease of installation. . <br /> Specifications <br /> No formal design is required for a check dam; however, the following criteria should be <br /> adhered to when specifying check dams. <br /> r <br /> 4-105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.