My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-009 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-009 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:19:40 AM
Creation date
9/30/2015 11:54:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/08/2008
Control Number
2008-009 (5)
Agenda Item Number
11.I.1
Entity Name
H & J Contracting
Subject
CR 512 Phase IV Improvements
Area
CR 512
Project Number
9611
Bid Number
2008012
Supplemental fields
SmeadsoftID
6833
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florida Erosion and Sediment Control Inspector's Manual <br /> Horizontal Wells <br /> This system also consists of a series of ditches leading to a sump hole or pump . The <br /> ditches are filled with sand or gravel surrounding a perforated pipe. A geotextile may also <br /> be used to prevent excessive migration of fines into the system. The discharged water <br /> must be treated before release as described above . <br /> Well-point Systems <br /> The well-point system is the preferred system for dewatering and should be used whenever <br /> possible . The initial discharge yields the sediments displaced by the installation of the <br /> small collector pipes . This can be directed into the excavation , a small settling or filtration <br /> facility, or larger temporary impoundment. Thereafter the water is generally clear ground <br /> water and may be discharged into a receiving water body prodided that there is suitable <br /> conveyance . <br /> Maintenance <br /> 1 . Any water impoundment must be inspected daily to preventfailur e of dikes , berms , <br /> or control structures . Minor problems should be repaired at once. Major problems <br /> will require a redesign and plan modification . <br /> 2. Any filtration device must be inspected and cleaned frequently. The discharge <br /> should be monitored daily and whenever the pumps are started . Inspection and <br /> maintenance of the system are best performed when the facility is dry. The first <br /> signs of diminished performance should be an alarm that maintenance is required . <br /> If the facilitywill no longer drain itself, the untreated water must be pumped back to <br /> its source , rather than by-passing the facility and discharging to the water body or <br /> stormwater system. <br /> 3 . Floating turbidity barriers shall be maintained as per FLOATING TURBIDITY <br /> BARRIER - Section 4.45 <br /> 4- 114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.