My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-030
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2016 2:19:57 PM
Creation date
9/30/2015 7:18:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2004
Control Number
2004-030
Agenda Item Number
7.F.
Entity Name
Oklawaha Farms Inc.
Subject
Harmony Oaks Mitigation Project Wetlands restoration
Area
Vero Shores
Project Number
9219A
Bid Number
6045
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3631
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 . any CONTRACTOR interpretation of or performance of the Work; subject, however, to the <br /> conclusion drawn from any "technical data" or any following: <br /> such other data, interpretations, opinions, or infor- <br /> mation. a. such condition must meet any one or <br /> more of the categories described in paragraph <br /> New Paragraph 4.02.0 has been added. See the 4 .03 .A; and <br /> Supplementary Conditions. <br /> b. with respect to Work that is paid for on a <br /> 4 . 03 Differing Subsurface or Physical Conditions Unit Price Basis, any adjustment in Contract <br /> Price will be subject to the provisions of para- <br /> A. Notice: If CONTRACTOR believes that any graphs 9 .08 and 11 . 03 . <br /> subsurface or physical condition at or contiguous to the Site <br /> that is uncovered or revealed either: 2. CONTRACTOR shall not be entitled to <br /> any adjustment in the Contract Price or Contract <br /> 1 . is of such a nature as to establish that any Times if: <br /> "technical data" on which CONTRACTOR is <br /> entitled to rely as provided in paragraph 4.02 is a. CONTRACTOR knew of the existence <br /> materially inaccurate; or of such conditions at the time CONTRACTOR <br /> made a final commitment to OWNER in respect <br /> 2 . is of such a nature as to require a change of Contract Price and Contract Times by the <br /> in the Contract Documents; or submission of a Bid or becoming bound under a <br /> negotiated contract; or <br /> 3 , differs materially from that shown or <br /> indicated in the Contract Documents ; or b . the existence of such condition could <br /> reasonably have been discovered or revealed as a <br /> 4 . is of an unusual nature, and differs result of any examination, investigation, explo- <br /> materially from conditions ordinarily encountered ration, test, or study of the Site and contiguous <br /> and generally recognized as inherent in work of the areas required by the Bidding Requirements or <br /> character provided for in the Contract Documents; Contract Documents to be conducted by or for <br /> CONTRACTOR prior to CONTRACTOR's <br /> then CONTRACTOR shall, promptly after becoming aware making such final commitment; or <br /> thereof and before further disturbing the subsurface or <br /> physical conditions or performing any Work in connection c. CONTRACTOR failed to give the <br /> therewith (except in an emergency as required by paragraph written notice within the time and as required by <br /> 6. 16.A), notify OWNER and ENGINEER in writing about paragraph 4 . 03 .A. <br /> such condition. CONTRACTOR shall not further disturb <br /> such condition or perform any Work in connection Part of the second sentence of Paragraph 4.03 .C .3 has <br /> therewith (except as aforesaid) until receipt of written order been deleted. <br /> to do so. 3 . If OWNER and CONTRACTOR are <br /> unable to agree on entitlement to or on the amount <br /> B . ENGINEER 's Review: After receipt of written or extent, if any, of any adjustment in the Contract <br /> notice as required by paragraph 4 .03 .A, ENGINEER will Price or Contract Times, or both, a Claim may be <br /> promptly review the pertinent condition, determine the made therefor as provided in paragraph <br />10. 05 . <br /> necessity of OWNER's obtaining additional exploration or However, OWNER, ENGINEER, and <br /> tests with respect thereto, and advise OWNER in writing ENGINEER' s Consultants shall not be liable to <br /> (with a copy to CONTRACTOR) of ENGINEER' s findings CONTRACTOR for any claims, costs, losses, or <br /> and conclusions. damages (including but not limited to all fees and <br /> charges of engineers, architects, attorneys, and other <br /> C . Possible Price and Times Adjustments professionals and all court or <br /> arbitration or- <br /> dispute resolution costs) sustained by <br /> 1 . The Contract Price or the Contract CONTRACTOR on or in connection with any other <br /> Times, or both, will be equitably adjusted to the project or anticipated project. <br /> extent that the existence of such differing subsurface <br /> or physical condition causes an increase or decrease <br /> in CONTRACTOR' s cost of, or time required for, <br /> r00700 - 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.