A. CONTRACTOR shall supervise, inspect, and facilities and incidentals necessary for the performance, <br /> direct the Work competently and efficiently, devoting such testing, start-up, and completion of the Work. <br /> attention thereto and applying such skills and expertise as <br /> ' may be necessary to perform the Work in accordance with B . All materials and equipment incorporated into the <br /> the Contract Documents. CONTRACTOR shall be solely Work shall be as specified or, if not specified, shall be of <br /> responsible for the means, methods, techniques, sequences, good quality and new, except as otherwise provided in the <br /> ' and procedures of construction, but CONTRACTOR shall Contract Documents. All warranties and guarantees <br /> not be responsible for the negligence of OWNER or specifically called for by the Specifications shall <br /> expressly <br /> ENGINEER in the design or specification of a specific run to the benefit of OWNER. If required by ENGINEER, <br /> ' means, method, technique, sequence, or procedure of CONTRACTOR shall furnish satisfactory evidence <br /> construction which is shown or indicated in and expressly (including reports of required tests) as to the source, <br />kind, <br /> required by the Contract Documents. CONTRACTOR and quality of materials and equipment. All materials and <br /> shall be responsible to see that the completed Work equipment shall be stored, applied, installed, <br /> connected, <br /> ' complies accurately with the Contract Documents. erected, protected, used, cleaned, and conditioned in <br /> accordance with instructions of the applicable Supplier, <br /> B . At all times during the progress of the Work, except as otherwise may be provided in the Contract <br />Docu- <br /> ' CONTRACTOR shall assign a competent resident superin- ments . <br /> tendent thereto who shall not be replaced without written <br /> notice to OWNER and ENGINEER except under 6 . 04 Progress Schedule <br /> extraordinary circumstances. The superintendent will be <br /> CONTRACTOR' s representative at the Site and shall have A. CONTRACTOR shall adhere to the progress <br /> authority to act on behalf of CONTRACTOR. All schedule established in accordance with paragraph 2 .07 as it <br /> communications given to or received from the superin- may be adjusted from time to time as provided below. <br /> ' tendent shall be binding on CONTRACTOR. <br /> 1 . CONTRACTOR shall submit to ENGI- <br /> 6 . 02 Labor; Working Hours NEER for acceptance (to the extent indicated in <br /> paragraph 2 .07) proposed adjustments in the grog- <br /> ' A. CONTRACTOR shall provide competent, suitably ress schedule that will not result in changing the <br /> qualified personnel to survey, lay out, and construct the Contract Times (or Milestones). Such adjustments <br /> Work as required by the Contract Documents. CON- will conform generally to the progress schedule then <br /> ' TRACTOR shall at all times maintain good discipline and in effect and additionally will comply with any <br /> order at the Site . provisions of the General Requirements applicable <br /> thereto . <br /> B . Except as otherwise required for the safety or <br /> ' protection of persons or the Work or property at the Site or 2 . Proposed adjustments in the progress <br /> adjacent thereto, and except as otherwise stated in the schedule that will change the Contract Times <br /> (or <br /> Contract Documents, all Work at the Site shall be Milestones) shall be submitted in accordance with <br /> ' performed during regular working hours, and CON- the requirements of Article 12 . Such adjustments <br /> TRACTOR will not permit overtime work or the may only be made by a Change Order or Written <br /> performance of Work on Saturday, Sunday, or any legal Amendment in accordance with Article 12 . <br /> holiday without OWNER' s written consent (which will not <br /> ' be unreasonably withheld) given after prior written notice to 6 .05 Substitutes and "Or-Equals " <br /> ENGINEER. <br /> Paragraph 6.05.A has been deleted and replaced with a <br /> New Paragraphs 6.02.B. 1 , 2, 3, 4, 5, and 6 have been new paragraph. See the Supplementary Conditions. <br /> added. See the Supplementary Conditions. A ` 4 e.., , e. item of -«ate . ' or- equipment is <br /> . �. 111µ.V11Y1 <br /> rDoeuments by using <br /> 6 . 03 Services, Materials, and Equipment the name of , pr-epret item er- the Rafne of a ..t, , <br /> Supplier, the e: et « or- desei-7iption is inteaded to <br /> A. Unless otherwise specified in the General Re- , <br /> quirements, CONTRACTOR shall provide and assume full <br /> responsibility for all services, materials) equipment, labor, is ellowed by : ..-d reading <br /> adiubth , uv like, equivalent,t <br /> p <br /> transportation, construction equipment and machinery, "or e"a!" item . h t t ' � r. . . .tVa , Vth11 r <br /> ZLG1L]� <br /> tools, appliances, fuel, power, light, heat, telephone, water, of material or- equipment t ' ' or- eq:L4meat of oto <br /> sanitary facilities, temporary facilities, and all other <br /> 00700 - 20 <br />