My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-030
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2016 2:19:57 PM
Creation date
9/30/2015 7:18:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2004
Control Number
2004-030
Agenda Item Number
7.F.
Entity Name
Oklawaha Farms Inc.
Subject
Harmony Oaks Mitigation Project Wetlands restoration
Area
Vero Shores
Project Number
9219A
Bid Number
6045
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3631
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tby CONTRACTOR, any Subcontractor, Supplier, or any <br /> other individual or entity directly or indirectly employed by 6 . 17 Shop Drawings and Samples <br /> any of them to perform any of the Work, or anyone for <br /> ' whose acts any of them may be liable, shall be remedied by A. CONTRACTOR shall submit Shop Drawings to <br /> CONTRACTOR (except damage or loss attributable to the ENGINEER for review and approval in accordance with the <br /> fault of Drawings or Specifications or to the acts or acceptable schedule of Shop Drawings and Sample <br /> omissions of OWNER or ENGINEER or ENGINEER' s submittals. All submittals will be identified as ENGINEER <br /> Consultant, or anyone employed by any of them, or anyone may require and in the number of copies specified in the <br /> for whose acts any of them may be liable, and not General Requirements. The data shown <br /> on the Shop <br /> attributable, directly or indirectly, in whole or in part, to the Drawings will be complete with respect to <br /> quantities, <br /> fault or negligence of CONTRACTOR or any dimensions, specified performance and design criteria, <br /> Subcontractor, Supplier, or other individual or entity materials, and similar data to show ENGINEER the <br /> directly or indirectly employed by any of them). services, materials, and equipment CONTRACTOR <br /> CONTRACTOR's duties and responsibilities for safety and proposes to provide and to enable ENGINEER to review <br /> for protection of the Work shall continue until such time as the information for the limited purposes required <br /> by <br /> all the Work is completed and ENGINEER has issued a paragraph 6 . 17.E, <br /> notice to OWNER and CONTRACTOR in accordance with <br /> paragraph 14 .07 .B that the Work is acceptable (except as B . CONTRACTOR shall also submit Samples to <br /> otherwise expressly provided in connection with Substantial ENGINEER for review and approval in accordance with the <br /> Completion) . acceptable schedule of Shop Drawings and Sample <br /> submittals. Each Sample will be identified clearly as to <br /> 6 . 14 Safety Representative material, Supplier, pertinent data such as catalog numbers, <br /> and the use for which intended and otherwise as ENGI- <br /> A. CONTRACTOR shall designate a qualified and NEER may require to enable ENGINEER to review the <br /> experienced safety representative at the Site whose duties submittal for the limited purposes required by paragraph <br /> and responsibilities shall be the prevention of accidents and 6. 17 .E. The numbers of each Sample to be submitted will <br /> the maintaining and supervising of safety precautions and be as specified in the Specifications . <br /> ' programs. <br /> C. Where a Shop Drawing or Sample is required by <br /> 6 . 15 Hazard Communication Programs the Contract Documents or the schedule of Shop Drawings <br /> ' and Sample submittals acceptable to ENGINEER as <br /> A. CONTRACTOR shall be responsible for coordi- required by paragraph 2 .07, any related Work performed <br /> nating any exchange of material safety data sheets or other prior to ENGINEER' s review and approval of the pertinent <br /> hazard communication information required to be made submittal will be at the sole expense and responsibility of <br /> ' available to or exchanged between or among employers at CONTRACTOR. <br /> the Site in accordance with Laws or Regulations. <br /> D . Submittal Procedures <br /> ' 6 . 16 Emergencies <br /> 1 . Before submitting each Shop Drawing or <br /> A. In emergencies affecting the safety or protection of Sample, CONTRACTOR shall have determined and <br /> persons or the Work or property at the Site or adjacent verified: <br /> ' thereto, CONTRACTOR is obligated to act to prevent <br /> threatened damage, injury, or loss . CONTRACTOR shall a. all field measurements, quantities, dimen- <br /> give ENGINEER prompt written notice if CONTRACTOR sions, specified performance criteria, installation <br /> believes that any significant changes in the Work or requirements, materials, catalog numbers, <br /> and <br /> variations from the Contract Documents have been caused similar information with respect thereto ; <br /> thereby or are required as a result thereof. If ENGINEER <br /> determines that a change in the Contract Documents is b. all materials with respect to intended use, <br /> ' required because of the action taken by CONTRACTOR in fabrication, shipping, handling, storage, assem- <br /> response to such an emergency, a Work Change Directive bly, and installation pertaining to the perfor- <br /> or Change Order will be issued. mance of the Work; <br /> ' c . all information relative to means, meth- <br /> ods, techniques, sequences, and procedures of <br /> 00700 - 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.