My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-030
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2016 2:19:57 PM
Creation date
9/30/2015 7:18:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2004
Control Number
2004-030
Agenda Item Number
7.F.
Entity Name
Oklawaha Farms Inc.
Subject
Harmony Oaks Mitigation Project Wetlands restoration
Area
Vero Shores
Project Number
9219A
Bid Number
6045
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3631
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' graphs } 2 . 0 } E 2 a through 12 0 } .0 2 e, inelu 12 . 06 Delay Damages <br /> Give: <br /> ' Paragraphs 12 .06.A and 12 .06 B have been deleted and <br /> 12 . 02 Change of Contract Times replaced with a new paragraph. See the Supplementary <br /> Conditions. <br /> A. The Contract Times (or Milestones) may only be A. I ne event shall OIAL MR or- RT.-oDn-�� <br /> changed by a Change Order or by a Written Amendment. liable to GQ�R4�AGTOPU, any SubeentmeteF Any sup IiFw <br /> ' Any Claim for an adjustment in the Contract Times (or or- any ether- per-son or or-ganizmien, or- to any <br /> stuet�r for- e <br /> Milestones) shall be based on written notice submitted by en lege c any f theff4 a " <br /> the party making the claim to the ENGINEER and the other of eF esulfin exr a b + <br /> party to the Contract in accordance with the provisions of <br /> paragraph 10. 05 . } delays reaused b a, the tr , r <br /> Cnirrn AmmOn . ,,.- <br /> B . Any adjustment of the Contract Times (or <br /> Milestones) covered by a Change Order or of any Claim for 2 delays beyend the eenttel of beth <br /> an adjustment in the Contract Times (or Milestones) will be QAV: Mn and GQ, 9! n GT-Q :.,,.,, . a:.. .. btA <br /> determined in accordance with the provisions of this Limited to =acs, i}eeds, epidewAes, abxxomml weatheF <br /> ' Article 12 . <br /> 12 . 03 Delays Beyond CONTRACTOR 'S Control ether- AAYRdr <br /> Y � nb <br /> „_ _ _nte.... latex ti y ��ele 7 <br /> ' A. Where CONTRACTOR is prevented from <br /> completing any part of the Work within the Contract Times Gnntmet Pfiee Y. . nt to thisAFtiel 12 to Te== � <br /> (or Milestones) due to delay beyond the control of , <br /> CONTRACTOR, the Contract Times (or Milestones) will rlireetl attEiw + bl to Hor- inaefiens f OWNER <br /> be extended in an amount equal to the time lost due to such . <br /> delay if a Claim is made therefor as provided in paragraph <br /> ' 12 . 02 .A. Delays beyond the control of CONTRACTOR <br /> shall include, but not be limited to, acts or neglect by ARTICLE 13 - TESTS AND INSPECTIONS ; <br /> OWNER, acts or neglect of utility owners or other CORRECTION, REMOVAL OR ACCEPTANCE OF <br /> ' contractors performing other work as contemplated by DEFECTIVE WORK <br /> Article 7, fires, floods, epidemics, abnormal weather <br /> conditions, or acts of God. <br /> ' 12 . 04 Delays Within CONTRACTOR 's Control 13 . 01 Notice of Defects <br /> A. Prompt notice of all defective Work of which <br /> A. The Contract Times (or Milestones) will not be OWNER or ENGINEER has actual knowledge will be <br /> ' extended due to delays within the control of given to CONTRACTOR. All defective Work may be <br /> CONTRACTOR. Delays attributable to and within the rejected, corrected, or accepted as provided in this <br /> control of a Subcontractor or Supplier shall be deemed to be Article 13 . <br /> delays within the control of CONTRACTOR. <br /> 13 . 02 Access to Work <br /> 12 . 05 Delays Beyond OWNER 's and CONTRACTOR 'S <br /> Control A. OWNER, ENGINEER, ENGINEER' s Con- <br /> sultants, other representatives and personnel of OWNER, <br /> A. Where CONTRACTOR is prevented from independent testing laboratories, and governmental agencies <br /> completing any part of the Work within the Contract Times with jurisdictional interests will have access to the Site and <br /> (or Milestones) due to delay beyond the control of both the Work at reasonable times for their observation, <br /> ' OWNER and CONTRACTOR, an extension of the inspecting, and testing. CONTRACTOR shall provide <br /> Contract Times (or Milestones) in an amount equal to the them proper and safe conditions for such access and advise <br /> time lost due to such delay shall be CONTRACTOR' s sole them of CONTRACTOR' s Site safety procedures and <br /> ' and exclusive remedy for such delay. programs so that they may comply therewith as applicable . <br /> 00700 - 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.