Laserfiche WebLink
r <br /> SECTION 00800 = SUPPLEMENTARY CONDITIONS <br /> ' TO THE GENERAL CONDITIONS <br /> ' TABLE OF CONTENTS <br /> Article Title Article Number <br /> Introduction SC - 1 . 00 <br /> 1 Defined Terms SC — 1 . 01 <br /> Terminology SC — 1 . 02 <br /> Before Starting Construction SC —2 . 05 <br /> Pre-Construction Conference SC — 2 . 06 <br /> Coordination of Plans , Specifications , and Special Provisions SC — 3 . 06 <br /> Subsurface and Physical Conditions SC — 4 . 02 <br /> Differing Subsurface or Physical Conditions SC - 4 . 03 <br /> Hazardous Environmental Conditions at Site SC - 4 . 06 <br /> Performance , Payment and Other Bonds SC — 5 . 01 <br /> Certificates of Insurance SC — 5 . 03 <br /> CONTRACTOR' S Liability Insurance SC — 5 . 04 <br /> OWNER 'S Liability Insurance SC — 5 . 05 <br /> Property Insurance SC — 5 . 06 <br /> Waiver of Rights SC — 5 . 07 <br /> Receipt and Application of Insurance Proceeds SC — 5 . 08 <br /> Acceptance of Bonds and Insurance ; Option to Replace SC — 5 . 09 <br /> Labor; Working Hours SC — 6 . 02 <br /> Substitutions and " Or- Equals" SC — 6 . 05 <br /> Concerning Subcontractors , Suppliers , and Others SC — 6 . 06 <br /> Permits SC — 6 . 08 <br /> Shop Drawings and Samples SC — 6 . 17 <br /> Indemnification SC - 6 . 20 <br /> REVISED - 00800 - Supplementary Conditions — Revised 11 -24-03 <br /> 00800-i <br /> F:\Public Works\KeithMlStormwaler Projects\Harmony Oaks Mitigation Project\Construction Contract\Bidding and Construction Contract Documents\REVISED - 00800 - <br /> Supplementary Conditions.doc Rev. 05/01 <br />