My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-030
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2016 2:19:57 PM
Creation date
9/30/2015 7:18:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2004
Control Number
2004-030
Agenda Item Number
7.F.
Entity Name
Oklawaha Farms Inc.
Subject
Harmony Oaks Mitigation Project Wetlands restoration
Area
Vero Shores
Project Number
9219A
Bid Number
6045
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3631
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall the CONTRACTOR allow any Subcontractor to commence work on his <br /> t subcontract until all similar insurance required of the Subcontractor has been so <br /> obtained and approved . All such insurance shall remain in effect until final <br /> payment and at all times thereafter when CONTRACTOR may be correcting , <br /> removing or replacing defective Work in accordance with Article 13 . <br /> SC -2 . 06 Pre-Construction Conference <br /> ' SC-2 . 06 Delete paragraph GC-2. 06. A in its entirety and insert the following paragraph in its <br /> place: <br /> A. Immediately after awarding the contract, but before the CONTRACTOR begins <br /> work , the Engineer will call a pre-construction conference at a place the <br /> ENGINEER designates to establish an understanding among the parties as to <br /> the Work and to discuss schedules referred to in paragraph 2 . 05 . 13 , procedures <br /> for handling Shop Drawings and other submittals , and maintaining required <br /> records . Utility companies and others as appropriate will be requested to attend <br /> to discuss and coordinate work . <br /> SC -3 . 06 Coordination of Plans , Specifications, and Special Provisions <br /> SC-3 . 06 Add the following new paragraphs immediately after paragraph GC-3. 05: <br /> SC-3 . 06 Coordination of Plans, Specifications, and Special Provisions <br /> A. In case of discrepancy, the governing order of the documents shall be as follows : <br /> 1 . Written Interpretations <br /> 2 , Addenda <br /> 3 . Specifications <br /> 4 . Supplementary Conditions to the General Conditions <br /> 5 , General Conditions <br /> 6 . Approved Shop Drawings <br /> 7 , Drawings <br /> 8 , Referenced Standards . <br /> B . Written/computed dimensions shall govern over scaled dimensions . <br /> SC -4 . 02 Subsurface and Physical Conditions <br /> SC-4 . 02 Add the following new paragraphs immediately after paragraph GC-4. 02. 8: <br /> C . In the preparation of Drawings and Specifications , ENGINEER or ENGINEER's <br /> Consultants did not rely upon any reports of explorations and tests of subsurface <br /> conditions at the Site . Likewise , in the preparation of Drawings and <br /> Specifications , ENGINEER or ENGINEER's Consultants did not rely upon any <br /> drawings of physical conditions in or relating to existing surface and subsurface <br /> structures which are at or contiguous to the Site . <br /> SC4. 03 Differing Subsurface or Physical Conditions <br /> SC-4 . 03 . C . 3 Delete the following text from the second sentence of paragraph GC-4. 03. C. 3: <br /> SC -4 . 06 Hazardous Environmental Conditions at Site <br /> REVISED - 00800 - Supplementary Conditions — Revised 11 -24-03 <br /> 00800-2 <br /> F:\Public Works\KeilhMlStormwater Projects\Harmony Oaks Miliga6on Project\Construction Contract\Bidding and Construction Contract Documents\REVISED - 00800 - <br /> Supplementary Conditions.doc Rev. 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.