My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-030
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2016 2:19:57 PM
Creation date
9/30/2015 7:18:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2004
Control Number
2004-030
Agenda Item Number
7.F.
Entity Name
Oklawaha Farms Inc.
Subject
Harmony Oaks Mitigation Project Wetlands restoration
Area
Vero Shores
Project Number
9219A
Bid Number
6045
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3631
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in accordance with this paragraph SC-5 . 06 shall comply with the requirements of <br /> paragraph 5 . 06 . 0 of the General Conditions , <br /> SC-5 . 06 . E Delete paragraph GC-5. 06. E in its entirety. <br /> SC -5. 07 Waiver of Rights <br /> SC-5 . 07 Delete GC-5. 07 (paragraphs A, B, and C) in its entirety. <br /> SC -5.08 Receipt and Application of Insurance Proceeds <br /> SC-5 . 08 Delete GC-5. 08 (paragraphs A and B) in its entirety. <br /> SC -5. 09 Acceptance of Bonds and Insurance ; Option to Replace <br /> SC-5 . 09 Delete GC-5. 09 in its entirety. <br /> Y <br /> SC -6 . 02 Labor; Working Hours <br /> SC-6 . 02 . 13 . Add the following paragraphs immediately after paragraph GC- 6. 02. 8: <br /> 1 . Regular working hours are defined as Monday through Friday , excluding Indian <br /> River County Holidays , from 7 a . m . to 5 p . m . <br /> ' 2 . Indian River County Holidays are : New Year's Day , Good Friday, Memorial Day , <br /> Independence Day, Labor Day, Veterans Day , Thanksgiving Day, Friday after <br /> Thanksgiving , Christmas Eve and Christmas Day. Working on these days will <br /> not be permitted without prior written permission and approval from the Engineer. <br /> 3 , The CONTRACTOR shall receive no additional compensation for overtime work , <br /> i . e . , work in excess of eight hours in any one calendar day or 40 hours in any one <br /> calendar week , even though such overtime work may be required under <br /> emergency conditions and may be ordered by the ENGINEER in writing . <br /> 4 . All costs of inspection and testing performed during overtime work by the <br /> CONTRACTOR, which is allowed solely for the convenience of the <br /> CONTRACTOR , shall be borne by the CONTRACTOR , and a credit given to the <br /> OWNER to deduct the costs of all such inspection and testing from any <br /> payments otherwise due the CONTRACTOR . <br /> 5 . All costs of OWNER' s employees and costs of ENGINEER's Consultant resulting <br /> from overtime work by the CONTRACTOR , which is allowed solely for the <br /> convenience of the CONTRACTOR , shall be borne by the CONTRACTOR, and a <br /> credit given to OWNER to deduct all such costs from any payments otherwise <br /> due the CONTRACTOR . <br /> 6 . No work shall commence before 7 a . m . or continue after 7 p . m . except in case of <br /> emergency upon specific permission of the ENGINEER . <br /> SC -6 . 05 Substitutes and " Or-Equals " <br /> SC-6 . 05 .A Delete paragraph GC-6. 05.A in its entirety and insert the following in its place: <br /> A . Whenever an item of material or equipment is specified or described in the Con - <br /> tract Documents by using the name of a proprietary item or the name of a <br /> particular Supplier, that proprietary item or particular Supplier shall be used and no <br /> other will be considered . If the specification or description contains or is followed <br /> by words such as "equivalent" or "or-equal , " then the specification or description is <br /> intended to establish the type , function , appearance , and quality required . In such <br /> REVISED - 00800 - Supplementary Conditions — Revised 11 -24-03 <br /> 00800-6 <br /> F:\Public Works\KeithM\Stormwater Projects\Harmony Oaks Mitigation Project\Construction Contract\Bidding and Construction Contrail Documents\REVISED - 00800 <br /> - <br /> Supplementary Conditions.doc Rev. 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.