Laserfiche WebLink
plants , planting , maintenance , warranty, and watering . <br /> MISCELLANEOUS <br /> M . Item 4 . 01 — Construction Contingency: <br /> 1 . Measurement and Payment: This part of the Contract is reserved for minor <br /> change orders , if any. This line item will be expended only as approved by the <br /> ENGINEER . The purpose of this line item is to negate the need to obtain <br /> County Commission approval for minor change order work , and thus , speed the <br /> construction process . <br /> ' PART 2 OF THE CONTRACT <br /> N . Items 1 . 01 , 1 . 029 1 . 031 1 . 04 , and 1 . 05 - Five-Year Maintenance of Wetland <br /> Mitigation Area Following Final Acceptance by OWNER — Maintenance for Year 1 , <br /> 21 31 4 , and 5 , respectively: <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation <br /> for maintaining the wetland mitigation area as discussed in Section 02239 , <br /> including but not limited to , all labor, materials and equipment, water, temporary <br /> irrigation system , removal of exotics using methods approved by both the <br /> OWNER and St . Johns River Water Management District (SJRWMD ) — i . e . <br /> ' hand remove or lightly spray with SJRWMD approved herbicides ) , and filling , <br /> leveling , and repairing of any rutted , washed or eroded areas , regardless of <br /> when or how the erosion occurs . Payment will be made quarterly based upon <br /> approved quarterly invoices . <br /> ALTERNATIVE BID ITEMS <br /> ' O . Item A . 2 - Mulch exotic vegetation and till the mulched vegetation into the ground to <br /> a minimum depth of 6 inches : <br /> 1 . Measurement and Payment: The lump sum deduct from the Contract Price will <br /> represent full compensation for mulching exotic vegetation from Restoration <br /> Area Zones A , B , and C and from the Enhancement Area and working the <br /> mulched material into the ground as specified . <br /> + + END OF SECTION + + <br /> Last revised 1 /13/04 01025-6 HARMONY OAKS <br /> R\Public Works\KeithM\Stormwater Projects\Harmony Oaks Mitigation Project\Construction ContractUechnical <br /> Specifications\Division 1 \Addendum #1 - 01025 - Measurement and Payment.doc <br /> 1 <br /> 1 <br />